Laserfiche WebLink
<br />, <br /> <br />CHANGE ORDER NO.1 <br /> <br /> <br />ram <br /> <br />URS .Iob No.: 31809837 <br /> <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55 J 12 <br /> <br />Date oflssuance: June 12, 2006 <br /> <br />Contractor: <br /> <br />Amt Construction, Inc, <br />r.o, Box 549 <br />Hugo, MN 55038 <br /> <br />Engineer: URS Corporation <br />Thresher Square Building <br />700 Third Street South <br />Minneapolis, MN 55415 <br /> <br />Description of Chanl!.e Order: <br />The contract is hereby modified to reduce scope in order to bener mectthc available funding. The main items modified <br />include common excavation and common channel excavation, storm sewer piping, watermain hydrants, Plping and <br />finings. More detail regarding line items effected by Change Order 1 is provided in the attachment to Change Order I, <br /> <br />Change Order Summarv: <br />Schedule A - Roadway <br />Schedule B - Storm Drainage <br />Schedule C - Watermain <br />Total Contract Moditication for Change Order No.1 <br /> <br />($12,269.40) <br />($45,422.76) <br />($60,998.00) <br />($118,690.16) <br /> <br />Contract Sumnlarv: <br />Original ContraetAmount: <br />Contract Moditieations to Date: <br />Contract Moditieations This Change Order: <br />Revised Contract Amount: <br /> <br />$1,808,584.32 <br />$0.00 <br />($118,690.16) <br />$1,689,894.16 <br /> <br />There will be no changes in the Contract time as a result of these revisions. <br /> <br />Recommended: <br /> <br />Agreed to: <br /> <br />By: <br /> <br />By: <br /> <br />URS Corporation <br /> <br />Amt Construction, lne, <br /> <br />Approved By: <br /> <br />City of Arden Hills <br /> <br />e <br />