My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 02-08-1960
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1960-1969
>
1960
>
CC 02-08-1960
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:19:10 AM
Creation date
11/27/2006 9:03:10 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� <br />� <br />� <br />kind of money. It wen't be possible for each individual to <br />have a vote on this sort of thin�C. ITm wondezing if this is <br />really representation when you have four-fifths of the Council <br />pass on something that might cost me $3,000. <br />aR, pppG`JICH: Thexe is no answer except that elections are <br />never held on them. You can'� tell me one villaqe that ever voted <br />on a sanitary sewer system. <br />N�. OLEP1: '�r�e had one vote on this and it was voted down. <br />[�'R. nOPQVICH: That was on a bond issue for levying ovar <br />� <br />the entire village and making it a full faith General Obligation <br />IIond. None of this is genezal obiigation. fhis is all special <br />assessment. 'n'here you have special assessment it's done this way. <br />The only other utiliti@s thinq you vote on is water because on that <br />the law reyuires that you must vote. However, the various interim <br />committees that are studying it are going to recommend to the <br />next legislature that you don't even vote on wat�r - that you do <br />the same as all other improvements. This is local improvement code <br />and sewers. parks, playqrounds. tree cutting. streets going in, <br />burbing� black topping are all done uader the local improvement <br />code without an election. <br />Nft. JGHI�fftYSGAARD: 1744 No. Pascal: I had one commmnt with <br />� <br />respect to the aanparisons 9iven here before. The comparlsons in <br />cost between Falcon Heights, which incidentally I participatsd in <br />and paid at that time. and the Rosaville figures. There was a <br />vast difference I believe in the specifications regarding those <br />two jobs insofar as the back filling and street maint�nance. In <br />Falcon }ieights the streets were re-built following the completion of <br />the sewer project. <br />NR. SHORT: There is no estimate of cost included for street <br />
The URL can be used to link to this page
Your browser does not support the video tag.