My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 02-08-1960
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1960-1969
>
1960
>
CC 02-08-1960
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:19:10 AM
Creation date
11/27/2006 9:03:10 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� <br />resurfacinq. <br />� <br />2'7 <br />N�ft. F.YSGAARD: This is set up as the same specs as Roseville - <br />h�. SHORT: There are no specs at this time but as was the <br />case in Improvement N�. 1 and the hearinq for Number 2, there is <br />no street surfacing included within the estimated costs. <br />N�t. POPGVICH: This is the very statement I made before. <br />� <br />It's hard to compare unless you're comparing the same thing. You're <br />right on that because you have to know what's included in a project <br />to compare. These other villages are all doing the same thin9 here. <br />They are not putting in permanent street repair because it's foolish <br />to do it because you know some time you may have water. Falcon <br />Heights had water so it made sense for them to permanently resurface <br />the streets but in a situation lik� this you have to be careful because <br />there might be other improvements coming along. <br />hR. RYSGr1l,RD: Faleon Heights installatian included stubs <br />to the property line so there was not the necessity to ever dig <br />in:o the streets for sewer construction. <br />MR. POPOVICH: 5o does this. <br />NR. 3ANISTER: The stubs here to the propesty line are lncluded. <br />� <br />It's pretty much generally accepted that the street repair or street <br />surfacing is going tok� moze expensive. It'� goinq to cost the <br />property owners or village more if it's done by the sewer contractor <br />if done as part of the sewer job because in spite of all of the <br />compaction that's tzied - and Falcon Heights experienced this if <br />you were there - there is still some settling afterwards and you <br />do not gain the street surface done iranediately afterwards that <br />would be gained or obtained if you were to walt a year or two. <br />Secondly, the type of work is different and the contractor - the <br />
The URL can be used to link to this page
Your browser does not support the video tag.