My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-07-07-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
02-07-07-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 9:03:13 AM
Creation date
2/16/2007 9:55:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> campus that addresses a number of environmental, drainage, and st0ll11water issues and how <br /> the impacts of the campus expansion can be mitigated (Attachment 3D-3). Thc Study also . <br /> includes the applicable regulations that the College is subject to. The campus is divided into <br /> twelve watersheds, and the types of best management practice (BMP) that would be <br /> appropriate within each watershed is listed in the study. The appendix includes a description <br /> of each type of BMP and Figures 5 & 6 show where stormwater management features may <br /> be located. <br /> The Stormwater Study and proposed BMPs is not meant to prescribe the exact stonnwater <br /> collection and treatment measures that will be implemented with each new or expanded <br /> building. Instead, the Study provides a toolbox of mitigation measures and best management <br /> practices that can be used before, during and after each stage of constnlction. Similar to the <br /> landscaping plan, a detailed stonnwater management plan will need to be submitted with <br /> each proposed building or expansion on the Arden Hills side of the campus. <br /> The full study with a complete listing of the best management practices is in POF f0l111at on <br /> the CD in Attachment 3D-3 and online at www.ci.arden-hills.mn.us. <br /> 10. Student Population <br /> The current student population is approximately 1,650 students, which is the maximum <br /> permitted by thc Conditional Use Permit from 1996 (Planning Case 96-22). The Master Plan <br /> proposes to increase the student population to 2400 by the year 2018, which is a 45.5 percent <br /> increasc. The proposed growth per year can be seen on page 6 of the PUD Application <br /> Rep0l1. . <br /> For comparison, Bethel University has approximately 2800 students at their Arden Hills <br /> campus. <br /> 11. Additional Review <br /> The Fire Marshal, City Attoll1ey, and Building Official are reviewing the proposal and will <br /> have comments prepared for the March Planning Commission meeting. <br /> The City Engineer's comments are included in Attachment 30-2. The comments are general <br /> in nature because more detailed reviews would be conducted as individual projects within the <br /> plan are constructed. <br /> Ci()' u/Anl.'ll lIills <br /> P/{[//f1illg Commissioll Meeting/i)r Fcbrum:I' 7, 2007 <br /> '.'-:\-!etw-ineLus'-anknhills-'Planning'J>lanning Cases\20l)I)\O()-o37 Northwestern College \1aster Plan (1'I.:NDI!\G)'OI2407 - PC J{cporl- . <br /> :'>orthwcstern College Master Plan_d\lc <br /> Page /Or1'12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.