Laserfiche WebLink
<br />. <br /> October 1 (1, 200(, <br /> Ms. f\.-lichclk \Volfe <br /> City Administrator <br /> City of Arden Hills <br /> 1245 West Highway 96 <br /> Arden Hills. M!\ 55112 <br /> RE: 20()7 1'1\11' - '1i11 ~~ Overlay l>roject <br /> Dcar Ms. Wolfe, <br /> The following pruposal is offered as a scoping document, estimated fees and schednle for the above- <br /> referenced project. <br /> GENERAL PRO.meT SCOPE <br />. The proposed scope of work includes services for preliminary engineering, preparation of final plans, and <br /> construction services for the proposed street improvements on the residential streets indicated in the City <br /> of Arden IIill' s Capitallmprovement Plan felr the 2007 Pavement !vlanagcment Program. <br /> BASIC SERVICES <br /> Design & Feasihility Repor-t <br /> Rosc\iillL: ,viII pl"l>vidc preliminary engineering services for the proposed project. Roseville will conduct <br /> field reviews of the project site as necessary and prepare presentation graphics and exhibits for public <br /> information. Roseville \vill make modifications to the proposed improvement scope as directed by City <br /> staff and the Coul1ci I. Rosevi lie wi 11 prepare and conduct a neighborhood meeting during the preparation <br /> of the feasibility report in order to educate the public and to promote project involvement with the <br /> residents. Rost'vi lie will present the findings of the feasibility report to City Council including the <br /> preparation of a presentation Il)r the Council at a formal Public I !caring. <br /> Final Design <br /> Roseville will prepare final plans and specifications for the project. City stalfwill provide as-built <br /> infonnation as needed ftw the project. Final plans and specifications will be prepared to City standards <br /> and \vill include removal plans. utility reconstruction plans, grading plans, and details, as necessary for <br /> the 2007 PavcmclltMana~crncnt Program. Final plans and specifications will be submitted to City staff <br /> lor review and comment. Rost:villc \vill develop a presentation fi.1J" the tlmnal assessment hearing Il,r the <br /> project near the completion of the final design phase. <br />. ~()(;(J Civic Cf'nt,'r DriVt' .:. J:nsf'ville, i\lirIlH's()!OI ::;5.113 <br /> (,;-, 1-;''l~-r:OSF .:. TUD ()51-rl):l TN') .:. \\'\\'w.ci.rosl'ville.mn.lIs <br />