Laserfiche WebLink
<br />Sheet C3 - Preliminary Utility Plan <br />. Please make the following changes in the Utility Construction Notes: #8- "Inspections" is misspelled; <br />#9- "Contractor" is misspelled; # 13- please change the reference to the MMUTCD from the <br />December, 200 I edition to the latest edition. <br />. Please label pipe sizes for the proposed storm sewer. <br /> <br />Sheet C5- Civil Details <br />· Retaining wall detail: Retaining walls four feet in height and taller will require railings for safety <br />purposes. <br />. Catch basin inlet protection: the detail states use in conjunction with Neenah R-3067 castings. Based <br />on the plan sheets, Neenah R-3250 castings are proposed. Please modify to ensure the inlet protection <br />is appropriate for proposed castings. <br />