<br />8/23/2007 <br />Page 3 <br /> <br />The evaluation panel felt that II fInns met the requirements the City was looking for in an engineering <br />consultant. Staff interviewed these II fIrms and recommends the following fIrms for the City of Arden <br />Hills' Municipal Engineering Consultant Pool. <br /> <br />Planning <br />Kimley-Hom and Associates, Inc. <br />SRF Consulting Group, Inc. <br />URS Corporation <br />WSB and Associates, Inc. <br /> <br />Municipal Proiects <br />Bolton and Menk, Inc. <br />Kimley-Hom and Associates, Inc. <br />McCombs, Frank, Roos Associates, Inc. <br />WSB and Associates, Inc. <br /> <br />Miscellaneous Engineering <br />Barr Engineering <br />Bonestroo <br />URS Corporation <br /> <br />TraffIc and Transportation Engineering <br />Bolton and Menk, Inc. <br />Jacobs, Edwards and Kelcey, Inc. <br />SRF Consulting Group, Inc. <br /> <br />Surface Water Resources Engineering <br />Barr Engineering <br />KimIey-Hom and Associates, Inc. <br />WSB and Associates, Inc. <br /> <br />Staff had originally anticipated selecting fIve fIrms per category; this was reduced to three to four fIrms <br />after analyzing the projected work in each category. Staff felt that a larger pool could not be justifIed for <br />some of the categories, as we do not anticipate many projects over the next several years. We felt <br />comfortable increasing the pool to four for the Planning and Municipal Projects categories, because these <br />are the areas where the City would likely generate more projects that may need to be hired out to <br />consultants. <br /> <br />Staff felt that the interview process went extremely well. We were pleased with the quality of the <br />consultant teams; it was diffIcult to narrow the fIelds. The fIrms in each category were selected based on <br />experience that would prove benefIcial to Arden Hills. For example, the fIrms selected for the Surface <br />Water Resources Engineering category showed extensive experience and a good working relationship <br />with the Rice Creek Watershed District (RCWD), which is important to Arden Hills, as the entire City is <br />under RCWD jurisdiction. <br /> <br />The fIrms selected for planning all had extensive experience with overall water and sanitary sewer system <br />plan review, including water tower and lift station design. In addition to this, SRF is currently working <br />on the AUAR for the TCAAP site. Representatives from WSB worked on the TCAAP groundwater <br />treatment system when it was installed in the 1970s. <br /> <br />The fIrms in the proposed Municipal Projects pool all showed strengths in preparing and completing <br />public improvement projects, realizing the importance of communication with City staff and affected <br />property owners. <br /> <br />The fIrms in the Miscellaneous Engineering category have signifIcant experience in dealing with <br />BrownfIelds, as well as knowledge about the contamination on the TCAAP site. Barr Engineering has <br />worked with the City of New Brighton extensively on TCAAP related contamination, and representatives <br />from Bonestroo have worked on the site itself during employment at previous fIrms. <br />