My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX E C <br />be based on facility necessity. Our thinking needs to change. <br />We need to think outside of the box. <br />The question was asked if the campus is large enough to handle <br />2400 FTE? Doug Schroeder addressed the Committee with some <br />thoughts of growth and that the campus could handle the 2400 <br />FTE with qualifications. <br />Discussion took place about the North Minneapolis campus and <br />Oak Hills from previous CMP meetings and the possible options <br />of an off site campus. <br />Doug Schroeder turned the meeting over to Larry Page. Larry <br />gave an overview of how the planning process can have a <br />domino affect. Academic, Facilities and Finance all go together <br />for campus planning. In our thinking and planning, Larry <br />would like us to focus not on just our areas but the campus <br />as a whole and how that will be affected with a FTE of 2400 <br />driven by academics. Once those things have been determined <br />then we can focus on the support services. Look at your <br />programs from where they have been and the demographics. <br />The demographics are leveling off. NWC has a unique product, <br />which we have to keep in mind as well. We need to keep the <br />mission of the organization in mind and plan around that. <br />Projections of FTE's 2400- some adjustments of facilities on <br />campus would need to be made and an addition of a new <br />building(s). Larry Page mentioned a discussion with himself <br />and Dr. Cureton about the Powerhouse and the loss of that <br />building and the possibilities of building a student center there. <br />There would be compliances with the DNR, building and city <br />ordinance to consider. <br />Doug Schroeder mentioned the deferred maintenance study of the <br />campus. The older campus buildings of Nazareth and Riley are <br />OK to remodel except the Powerhouse. These buildings need to <br />be renovated, so how do we do that while continuing to grow? <br />Currently we have a 15 million dollar deferred maintenance <br />deficit. How do we bring the buildings up to spec while <br />maintaining current service levels? <br />Larry Page shared what he would like to see the CMP group <br />accomplish. How will academic programs expand? What <br />programs would we consider offering? How much classroom <br />space or lab space is needed? Larry mentioned the need to <br />look at the market place and what is being offered. <br />Larry discussed what options we have as far as building <br />a facility to hold the 2400 students for chapel or do we <br />hold a couple of services along with possible options for food <br />services. Larry mentioned central scheduling software. He <br />mentioned high schools and block scheduling, time scheduling <br />NORTHWESTERN COLLEGE CAMPUS MASTER PLAN PARTNERS & SIRNY ARCHITECTS APP C.20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.