Laserfiche WebLink
<br />From Table 3, the total estimated peak period demand for the site as a whole is <br />317 parking spaces, The Eno Foundation's Parking document indicates that the <br />actual supply of parking should be 10 percent greater than the estimated demand. <br />Such additional supply will provide reserve capacity to allow for cruising vehicles <br />in search of a space, for snow storage and for other factors that cause <br />inefficiencies. With the 10 percent factor, the total parking supply needed is 349 <br />spaces (317 multiplied by 1.1). <br /> <br /> <br />Based on the parking review and the calculations presented in this report, the <br />minimum number of parking spaces that should be provided on the site upon <br />completion of the proposed redevelopment is 349 spaces. The current site plan <br />shows a total of 408 parking spaces. Thus, the current site plan will provide <br />adequate parking supply to meet the projected demand upon completion ofthe <br />proposed redevelopment. <br /> <br /> <br />ii, Relatively high parking demand near south end of site, We understand from comments <br />raised at the Planning Commission meeting on August I that parking demand near the <br />south end ofthe site is greater than elsewhere on the site, To determine whether the current <br />site plan would provide adequate parking supply in this area, we reviewed the proposed <br />supply and projected demand south ofthe driveway on Lexington A venue, As per the <br />current site plan presented in Figure I, the total parking supply in that area is 86 spaces. <br />For uses in the existing retail building that are south of the driveway on Lexington A venue <br />and assuming 100 percent retail for the proposed building C, the total parking demand in <br />this area is 147 spaces. Thus, for the area south of the driveway on Lexington Avenue, the <br />parking demand would be 61 spaces greater than the proposed supply, This shortage in <br />parking supply is addressed as follows: <br />o The developer presently is revising the site plan to accommodate the 14,300 <br />square feet for building C in a two-story building. This is different from the plan <br />shown in Figure I, which shows a one-story building. This change will reduce <br />the footprint for this building and, thereby, provide more space for parking. <br />Specifically, this change will increase the parking supply in the south area by <br />about 37 spaces, to 123 spaces. <br />o As indicated earlier, we assumed 100 percent retail for building C to be <br />conservative in our traffic and parking projections, Based on recent discussions <br />with the Developer, we understand that only 50 percent of building C will be <br />retail and the remaining 50 percent will be office space, The peak demand for <br />retail uses typically occurs in the evenings and on weekends when the parking <br />demand for office is virtually zero. With 50 percent office, the peak demand for <br />the area south of the driveway on Lexington Avenue will only be 126 spaces. <br /> <br />With greater parking supply due to reduced footprint for building C, the total number of <br />spaces in the area south of the driveway on Lexington Avenue will be 123. With 50 percent <br />of building C being retail, the total demand in that area will be 126 spaces. Thus, it is <br />expected that the current site plan with the changes to building C will provide adequate <br />parking supply near the south end of the site upon completion of the proposed development. <br /> <br />15 <br />