Laserfiche WebLink
<br />ARDEN HILLS PLANNING COMMISSION - NOVEMBER 7, 2007 <br /> <br />3 <br /> <br />7. Signage. The proposed monument sign at the County Road E and Lexington <br />Avenue intersection shall be removed. Each sign shall require a separate sign <br />permit prior to installation. <br /> <br /> <br />8. Retaining Wall. The wood retaining wall near the Lexington Avenue entrance <br />shall be removed and re-graded or replaced with block, stone, or other similar <br />materials that are compatible with the building materials used in the development. <br /> <br />9. Fencing. The fence along Lexington Avenue shall be replaced with a fence that is <br />compatible with the building materials used in the development. <br /> <br />10. Sidewalk. The asphalt path along Lexington Avenue shall be replaced with a <br />concrete sidewalk that is at least six feet in width. The sidewalk shall extend from <br />the sidewalk at County Road E to the Lexington Avenue entrance. The applicant <br />shall repair or replace the sidewalk along Count y Road E if any damage is done <br />during construction. <br /> <br />1 I. Screening. The dumpsters and mechanical equipment shall be fully screened from <br />public view with fencing and/or landscaping. <br /> <br />12. Fire Marshal Review. The plans shall be subject to fire marshal approval before <br />building permits are issues. <br /> <br />13. Engineer Review. Final grading, drainage, and utility plans shall be subject to <br />approval by the Public Works Director and City Engineer prior to the issuance of <br />any building permits. <br /> <br />14. Stormwater. The applicant shall obtain approval from the Rice Creek Watershed <br />District and all other applicable permitting agencies prior to the issuance of any <br />building permits. Copies of such permits shall be provided to the City prior to the <br />issuance of any building permits. <br /> <br />15. Traffic Mitigation Measures. The following traffic mitigation measure shall be <br />implemented to reduce the traffic impact ofthe development: <br />a. The site accesses at County Road E and Lexington Avenue shall be modified <br />to provide right-turn lanes that are approximately 200 feet in length. <br />b. A north-south center median of sufficient length shall be installed at the <br />County Road E access to prohibit vehicles from entering Lot 2 at the <br />northwest entrance point near the proposed pharmacy. <br />c. The County shall reserve the right to restrict access at the County Road E <br />entrance to improve operation, safety, and access management. <br />d. The pharmacy drive-through shall be modified to be one-way southbound, and <br />the adjacent 90 degree parking stalls shall be angled to be compatible with the <br />one-way movement. <br /> <br />DRAFT <br /> <br />