<br />3. Planned Unit Development (PUD) Process: <br /> <br />The Planned Unit Development (PUD) process is often a two step process; however, it can <br />vary depending on the project. The fIrst step is usually the Master PUD, and the second step <br />is usually the Final PUD. In some instances, the Final PUD or a portion of the Final PUD is <br />reviewed in combination with the Master PUD. In other instances, the development is <br />separated into phases over a period of time. The Arden Plaza redevelopment proposal is a <br />hybrid version of these two options, which is permissible, <br /> <br />The PUD process is a tool that provides additional flexibility for developments that an <br />underlying zoning district would not otherwise allow. For example, a PUD may change the <br />setbacks, lot coverage, lot sizes, parking requirements, signage, building height, building <br />materials, landscaping requirements, etc. The PUD process cannot be used to permit uses <br />that would not otherwise be permitted in the underlying zone. The process is meant to create <br />a better development than the standard regulations would otherwise allow, and it is meant to <br />be flexible. While each PUD process is unique, it is a common processed used by many <br />cities, counties, and townships, <br /> <br />The PUD process allows the City to negotiate design aspects of the development; however, <br />any conditions imposed on the PUD should have a rational basis related to the impacts of the <br />development and/or any requested deviations from the City Codes. For example, if a <br />developer asked for a reduction in the required number of parking spaces, the city could <br />reasonably ask for increased pedestrian facilities, bike racks, and other related amenities that <br />offset the lost parking. <br /> <br />However, the conditions should not create a contradiction that forces a denial ofthe <br />application. For example, if a city were to require additional green space beyond the normal <br />regulations but that request directly caused the required parking spaces to be reduced, the city <br />should then not deny the application based on a lack of parking, <br /> <br />If a property is subdivided into multiple properties during the PUD process, it is still often <br />viewed as one contiguous development. The development as a whole would be expected to <br />meet the landscaping, stormwater, and other similar requirements, For example, one <br />property in the PUD may have 40 percent building coverage; however, the development as a <br />whole does not exceed 25 percent building coverage to maintain conformance with the <br />underlying zone. In order to maintain shared amenities such as landscaping and stormwater <br />ponds, the development is required to create a legal entity to manage and maintain the shared <br />amenities, This is a common feature in townhome and multi-tenant business developments. <br /> <br />During the Master PUD stage, the City works with the applicant to set an overall design <br />framework or standard for a proposed development, which generally includes the design <br />standards, the size ofthe development, and what, if any, deviations from the underlying <br />zoning district will be permitted. Once the Master PUD is approved, the applicant then <br /> <br />City of Arden Hills <br />City Council Work Session for November 13, 2007 <br /> <br />\\Metro-inet.uslardenhills\PlanninglPlanning Cases\2007\07-018 Arden Plaza PUD (In Review)1111307 - CC Report Work Session - Arden <br />Plaza - Master PUD.doc <br /> <br />Page 3 of 10 <br />