Laserfiche WebLink
<br />City Council prior to the approval's expiration date. Extension requests must be <br />submitted in writing to the City at least 45 days prior to the expiration date. <br />3. Final PUD Timeline. The applicant shall apply for a Final PUD of phase two and <br />three within three years ofthe Master PUD approval or the approval shall expire <br />unless extended by the City Council prior to the approval's expiration date, <br />Extension requests must be submitted in writing to the City at least 45 days prior to <br />the expiration date. <br />4. Tree Preservation. The applicant shall attempt to relocate as many of the existing <br />mature trees to other portions of the property as feasible, <br />5. Landscapinl!: Timeline. The landscaping plan shall be fully implemented with phase <br />one. Portions of the landscaping plan may be delayed for constrnction of phase two <br />and/or three subject to City Planner approval. <br />6. Landscapinl!: Escrow. The applicant shall submit a financial surety in the amount of <br />125 percent of the cost of the landscaping improvement for all three phases prior to <br />the issuance of any building permits for phase one. <br />7. Sil!:nal!:e. The proposed monument sign at the County Road E and Lexington Avenue <br />intersection shall be removed. Each sign shall require a separate sign permit prior to <br />installation. <br />8. Retaininl!: Wall. The wood retaining wall near the Lexington Avenue entrance shall <br />be removed and re-graded or replaced with block, stone, or other similar materials <br />that are compatible with the building materials used in the development. <br />9, Fencinl!:. The fence along Lexington Avenue shall be replaced with a fence that is <br />compatible with the building materials used in the development. The materials shall <br />be subj ect to City Planner approval prior to installation, <br />10. Sidewalk. The asphalt path along Lexington Avenue shall be replaced with a <br />concrete sidewalk that is at least six feet in width. The sidewalk shall extend from the <br />sidewalk at County Road E to the Lexington Avenue entrance, The applicant shall <br />repair or replace the sidewalk along County Road E if any damage is done during <br />construction. <br />11. Screeninl!:. The dumpsters and mechanical equipment shall be fully screened from <br />public view with fencing and/or landscaping. <br />12, Fire Marshal Review. The plans shall be subject to fire marshal approval before <br />building permits are issued. <br />13. Enl!:ineer Review. Final grading, drainage, and utility plans shall be subject to <br />approval by the Public Works Director and City Engineer prior to the issuance of any <br />building permits. <br />14. Stormwater. The applicant shall obtain approval from the Rice Creek Watershed <br />District and all other applicable permitting agencies prior to the issuance of any <br />building permits. Copies of such permits shall be provided to the City prior to the <br />issuance of any building permits. <br />15. Traffic Mitil!:ation Measures. The following traffic mitigation measures shall be <br />implemented to reduce the traffic impact of the development: <br /> <br /> <br />City of Arden Hills <br />City Council Work Session for November 13, 2007 <br /> <br />\\Metro-inet.uslardenhillslP/anning\Planning Cases\2007107-018 Arden Plaza PUD (In Review)1l11307 - CC Report Work Session _ Arden <br />Plaza - Master PUD.doc <br /> <br />Page 90C10 <br />