My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-10-07 Item 4C Civil Eng Tech Support Contract
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
12-10-07-R
>
12-10-07 Item 4C Civil Eng Tech Support Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2007 3:35:32 PM
Creation date
12/6/2007 3:28:58 PM
Metadata
Fields
Template:
General
Document
Item 4C Civil Engineering Tech Support
General - Type
Agenda Item
Date
12/10/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />:"}i::':";-':-:C::":"i"t':,::":-,,, ':':~;-:;;i":::':::':':, <br /> <br />'1\~. HILLS <br /> <br /> <br />Client: <br />City of Maplewood <br /> <br />CarMax/Mogren Improvements <br /> <br />Kimley-Horn assisted the City of Maplewood with preliminary design/ <br />feasibility study, final design, and construction phase services for public <br />improvements to support the redevelopment of a 60-acre parcel of land <br />at the northeast quadrant of the Trunk Highway 61 (TH 61) and Beam <br />Avenue intersection. The site is being redeveloped from a golf course to <br />a four lot office/retail development. The scope of the public improvements <br />Included the following: <br /> <br />. 1,500 linear feet of urban street <br />. 1,500 linear feet of sanitary sewer <br />. 1,500 linear feet of water main <br />. Storm drainage improvements including the construction of two ponds <br />. Three traffic signals <br />. Reconstruction and widening of 2,000 linear feet of Beam Avenue <br /> <br />The overall scope and design of the public improvements was closely <br />coordinated with the project developer. The design of improvements <br />along Beam Avenue and TH 61 was closely coordinated with Ramsey <br />County and Mn/DOT. The project also included significant coordination <br />with the Ramsey-Washington Metro Watershed District since a Watershed <br />ditch system runs through the project area. We also assisted city staff <br />by providing services to review plans and design information for the <br />associated private development improvements. <br /> <br /> <br />Location: <br />Maplewood, MN <br /> <br />Services: <br />Preliminary and final design and construction <br />phase services for new roadway construction <br />and widening; utility (sanitary sewer, water <br />main, and storm sewer) improvements; <br />construction of two ponds; and installation of <br />three traffic signals <br /> <br />1iI""1_.... Kimley-Hom <br />~_U andAssociates,lnc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.