My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-10-07 Item 4C Civil Eng Tech Support Contract
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
12-10-07-R
>
12-10-07 Item 4C Civil Eng Tech Support Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2007 3:35:32 PM
Creation date
12/6/2007 3:28:58 PM
Metadata
Fields
Template:
General
Document
Item 4C Civil Engineering Tech Support
General - Type
Agenda Item
Date
12/10/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. <br />.. <br /> <br />Specific Development Experience <br /> <br />.. <br />.. <br />I:IJ <br />><: <br />"0 <br />trJ <br />~ <br />....... <br />trJ <br />Z <br />n <br />trJ <br /> <br /> <br />Water's Edge Development <br />Hugo, MN <br /> <br />450 Acres Residential <br />1,100 Single/Multi-Family <br />Units <br /> <br />Development Review <br />Manager: Jay Kennedy <br /> <br />Water Resources Review: <br />Phil Belfiori <br /> <br />Traffic Operations <br />Review: Chuck Rickart <br /> <br />AUARlEnvironmental: <br />Andi Moffatt <br /> <br />A <br />WSB <br /> <br />&Associale!i,lnc_ <br /> <br />. Involvement started with concept and environmental documentation <br />through preliminary and final platting and construction <br /> <br />. Phased development of approximately 1,100 single and multi-family <br />residential units <br /> <br />. Project involved construction of a regional system of storm water treatment <br />ponds and infiltration basins, including modifications to the FEMA flood <br />maps. WSB provided the conceptual design of the system, and reviewed <br />the final design <br /> <br />. Project included many conservation development techniques, including <br />narrower road widths, infiltration basins, and small lot sizes <br /> <br />. Required permit from the Rice Creek Watershed District related to <br />modifications to a branch of Judicial Ditch #3 <br /> <br />. Included design and construction of a divided parkway collector roadway <br />that included landscaping and irrigation <br /> <br />. Included construction of off-site street and utility improvements. We <br />assisted the City with the negotiations as part of the Development <br />Agreement <br /> <br />. Included acquisition of a City well site within the development, as well as <br />the final design and construction of the well and wellhouse. <br /> <br />. Coordination with Washington County was required for the access to <br />County Road 8 <br /> <br />'_n'"~",-""_"",""",""""",,,,,,,.~ <br /> <br />/ i r <br />I( <br />IJ <br /> <br /> <br /> <br />~ "- <br />c-"J \ r <br />.........,'"----_) C,j. <br /> <br />J... <br /> <br />.-." '..-- <br />'~',-~':::-~::;., O!i!!i <br /> <br />"" <br /> <br />~ <br /> <br />.~%.. <br /> <br />-13 - <br /> <br />.. <br />.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.