My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Code of Ordinances
ArdenHills
>
Administration
>
City Council
>
Ordinances
>
1970-1979
>
1979
>
Code of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2008 5:40:29 PM
Creation date
5/22/2008 3:01:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ <br /> <br /> <br /> <br /> UTILITIES § 28-41 <br /> DIVISION 2. CONNECTIONS <br /> <br /> Sec. 28-41. Applications. <br /> (a) All applications for permits for service installations <br /> and for water service connectiona shall be made to the <br /> clerk-administrator on printed forms furnished by the city. <br /> (b) Applications for permits for service inatallation ahall <br /> be made by the owner of the property to be served or by the <br /> owner's agent and shall atate the size and location of service <br /> connection required. The applicant shall, at the time of <br /> making application, pay to the city the amount of feea or <br /> deposit required for the installation, all as hereinafter <br /> provided. <br /> (c) When the sezvice has been installed, application for <br /> water service may be made to the clerk-administrator by the <br /> owner, his agent, or the tenant or occupant of the premises. <br /> (d) The size of water service meters shall be subject to <br /> approval of the commisaioner in the case of nonresidenti8l <br /> service. <br /> (e) A meter spacer with tailpiece couplings will be <br /> furnished to the plumber at the time a connection permit <br /> is issued. Meter spacers will be picked up when the meter is <br /> inatalled under city supervision after completion of water <br /> service inatallation. <br /> (f) The plumber shall notify the clerk-administrator <br /> within twenty-four (24) hours after piping is complete and <br /> ready for meter installation, giving street address and <br /> service installation permit number. Such inspection as the <br /> commissioner shall deem appropriate shall then be made on <br /> behalf of the city. In all cases connection to the syatem <br /> must be made within sixty (60) days after the permit is issued. ' <br /> (g) Water billinga shall start at the time of the installation <br /> of the water meter; or in the event the water meter is not <br /> installed within thirty (30) days, ahall commence upon the <br /> thirty-first day from the date of the permit, and shall be <br /> Supp. No. 3 <br /> 1649 <br /> <br /> <br /> <br /> <br /> . ...J <br />
The URL can be used to link to this page
Your browser does not support the video tag.