My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7B, 2009 PMP & Resolution 2008-030
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
09-8-08-R
>
7B, 2009 PMP & Resolution 2008-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 10:07:48 AM
Creation date
9/10/2008 10:06:37 AM
Metadata
Fields
Template:
General
Document
2009 PMP & Resolution 2008-030
General - Type
2009 PMP & Resolution 2008-030
Date
9/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />September 4, 2008 <br /> <br />TO: <br /> <br />Mayor and City Council <br />Ron Moorse, City Administrator <br /> <br />FROM: <br /> <br />Kristine Giga, Civil Engineer <br />Deb Bloom, City Engineer <br />Greg Hoag, Public Works Director <br /> <br />SUBJECT: <br /> <br />2009 Pavement Management Program- Glenarden Neighborhood <br /> <br />BACKGROUND <br /> <br />The City of Arden Hills approved an engineering consultant pool on August 27, 2007 for use on <br />specialized projects or projects that the City of Rose viI Ie's Engineering Department may not <br />have the capacity to assist with. <br /> <br />The City Council authorized the City of Roseville's Engineering Department to begin the <br />feasibility study for the Glenarden Neighborhood on March 12,2007. Roseville staff completed <br />the field survey and began preliminary design. This project was initially intended for 2008; on <br />that time schedule, Roseville had the capacity to complete fillal design and construction services. <br />During budget discussions last fall, the City Council directed staff to delay this project to 2009. <br />Roseville does not have the capacity to complete final design and provide construction services <br />for the 2009 construction season. Therefore, a scope of work was prepared for completing the <br />feasibility report, final design, and construction services. City staff reviewed proposals submitted <br />by the firms in its municipal engineering pool, and is recommendi11g Bolton & Menk, Inc. for <br />this work. <br /> <br />DISCUSSION <br /> <br />Proposals were submitted by all four finns in the municipal engineering pool: Bolton & Menk, <br />Inc., Kimley-Hom and Associates, Inc., MFRA, and WSB and Associates, Inc. This contract <br /> <br />\\Metro-inet.us\ardenhills\PR&PW\Engineeling\2008\Counci} _ Actions\9-8-08Melno _ 2009PMP _Feasibility.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.