My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7B, 2009 PMP & Resolution 2008-030
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
09-8-08-R
>
7B, 2009 PMP & Resolution 2008-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 10:07:48 AM
Creation date
9/10/2008 10:06:37 AM
Metadata
Fields
Template:
General
Document
2009 PMP & Resolution 2008-030
General - Type
2009 PMP & Resolution 2008-030
Date
9/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Proiect Construction Staking <br />The Consultant must provide construction staking for the project including: <br /> <br />1. Provide line and grade stakes as required for all utility improvements. <br />2. Provide "cut sheets" for all utility improvements. <br />3. Provide line and grade stakes as required for all street improvements including curb <br />stakes, sidewalks, trails, etc. <br />4. Provide "cut sheets" for all street improvements. <br />5. Provide information for record drawings, including but not limited to top nut of hydrants, <br />manhole rims, and manhole inverts. <br /> <br />Proiect Construction Administration <br />The Consultant must provide construction administration for the project. Construction <br />administration should include: <br /> <br />1. Respond to design questions from City or residents. <br />2. Prepare the payment estimate based on the Construction Observer's log. <br />3. Tracking field notes, testing, and other items on the project. <br />4. Project filing and general administration <br />5. Coordinate weekly project meetings <br /> <br />As-built docun1entation <br />The Consultant will create the as-built record drawings based on the information collected by the <br />construction staking crew. <br /> <br />Work Completed to Date <br />Field surveying has been completed for the project. Base drawings have been generated in <br />AutoCAD 2007, and preliminary street design has been completed. This digital information will <br />be provided to the Consultant for use in completing the feasibility report and preparing final <br />plans. The enclosed CD includes mailings, public meeting presentations and pd:f s of plan sheets <br />to date. <br /> <br />Proiect Schedule <br />The following is the proposed schedule for the project. <br /> <br />Consultant Proposals Due at City of Arden Hills <br />City Council Awards Contract <br />Preliminary Engineering/Feasibility Report Preparation <br />Final Neighborhood Meeting <br />City Council Accepts Feasibility Report & Orders <br />Public Hearing <br />Public Hearing\City Council Authorizes <br />Preparation of Plans and Specs <br />Final Design <br />Bid Opening <br />Assessment Hearing <br />Begin Construction <br />Complete Construction <br /> <br />3 <br /> <br />August 21, 2008 <br />September 8, 2008 <br />September - November 2008 <br />November 2008 <br /> <br />December 8, 2008 <br /> <br />January 12, 2009 <br />January- February 2009 <br />March 2009 <br />April 2009 <br />May 2009 <br />September 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.