Laserfiche WebLink
<br /> <br />E3C)LTC)N & N1ENK, INC@ <br /> <br />Consulting Engineers & Surveyors <br />12224 NicoHetAvenue · BurnsviHe, MN 55337 <br />Phone (952) 890-0509. Fax (952) 890-8065 <br />www.bolton-menk.com <br /> <br /> <br />January 6, 2009 <br /> <br />Ms. Kristine Giga, P.E. <br />Civil Engineer <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112-5743 <br /> <br />RE: Proposal for Professional Engineering and Surveying Services <br />CP Rail Trail Underpass Improvements <br />City of Arden Hills, Minnesota <br />Project No.: Tl 6.1 00325 <br /> <br />Dear Ms. Giga: <br /> <br />Weare pleased to offer you our proposal for professional engineering and surveying services for the final <br />design of the CP Rail Trail Underpass Improvements along Old Highway lOin Arden Hills. This <br />proposal is based on those improvements described in our December 2008 Preliminary Engineering <br />Report for the Old Snelling A venue/ Old Highway 10 Trail, which was presented to the City Council on <br />December 8, 2008. As a part of this proposal, we describe our understanding of the project, detail our <br />proposed scope of \vork, and provide our fee for completing the work. <br /> <br />Final Design Services <br />As a part of the Preliminary Engineering Report for the Old Snelling A venue/ Old Highway 10 Trail, <br />Bolton & Menk discusses the possibilities of constructing a trail along Old Highway 10 with an underpass <br />crossing the existing CP Rail bridge. The recommended approach is to construct a bituminous trail <br />crossing under the bridge, between its piers and abutment. This approach would require the construction <br />of retaining walls at the crossing and along the north and south approaches to the crossing. The crossing <br />is illustrated in Figure No. 15 of the preliminary engineering report. At this time, it has not been decided <br />on which side of Old Highway 10 the underpass will be constructed. However, design and construction <br />of the underpass relative to each side of the roadway is expected to be similar. <br /> <br />Once the desired side of the roadway is selected for the underpass, Bolton & Menk will complete the <br />necessary topographic survey, final design and engineering required to prepare final construction plans <br />and specifications for contractor bidding. The topographic survey will be completed from the road edge <br />or curb to a point approximately thirty feet outside the road, and will extend approximately 200' to the <br />north and 200' to the south of the rail bridge. Locations and measurements of the applicable above-grade <br />geometry of the rail bridge, including the piers, abutments, clearance heights, etc. will also be recorded to <br />facilitate the underpass design. A Gopher One Call will also be initiated to identify any underground <br />utilities within the project area. Bolton & Menk, along with LHB as its structural engineering <br />subconsultant, will prepare detailed construction plans in CAD illustrating plan and profile views of the <br />underpass and its approaches (up to 200' in each direction). Cross sections win also be shown along with <br />