Laserfiche WebLink
4.6 Permits <br />Several permits will be required as part of the proposed construction. The anticipated permits <br />required and the respective regulatory agencies are listed below: <br />Minnesota Pollution Control Agency (MPCA) — <br />National Pollutant Discharge Elimination System (NPDES) ....Erosion/Stormwater Permit <br />Ramsey County.......................................................................................... Right of Way Permit <br />Rice Creek Watershed District.................................................................................. Stormwater <br />Minnesota Department of Health.............................................................................. • Watermain <br />State Aid Review............................................................................................ Valentine Avenue <br />4.7 Right of Way and Easements <br />The goal is to complete the project within the existing right of way and easements. Additional <br />easements are not anticipated with the preliminary design. <br />Feasibility Report <br />2010 Pavement Management Program— <br />City of Arden Hills, MN <br />WSB Project No. 1771-02 Page 9 <br />