My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4G, 2010 Engineering Work Plan
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
04-26-10-R
>
4G, 2010 Engineering Work Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:01:57 AM
Creation date
4/26/2010 3:22:40 PM
Metadata
Fields
Template:
General
Document
2010 Engineering Work Plan
General - Type
2010 Engineering Work Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�'t.� <br />� <br />� <br />� <br />Ph_ysical Dernands 8� V�orkin� Conditians: <br />Most work is in a normal af�ce environmen�. L�mited l�ftin� of t�venty five pounds or less �s <br />required u� to 15% af t1�e t�me. Travel within t1�e ��ty or region �a view projects or attend mee�ings <br />is I�ke1y to occur tv�o to three times weekly. There is sorne exposure ta field ar construction site <br />conditions vvhen visiting projects with�n the City. Occasio�a� attendance at evening Council <br />meetings and related mee�ings is required. <br />The Civi� Engineer is respansible for diver�e matters, many of v���ch have deadlines and requ�re <br />sig�ificant attention to detail. LTp to 45% of the time, work is pe�formed at the highest Ievel of detail <br />and press�re of deadlines. <br />Page 3 of� 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.