Laserfiche WebLink
was removed from the Zoning Code. However, the interim use permit process itself remains <br /> within the Code as an optional tool for future development in the City. <br /> Sighting a number of factors, including the slowed economy over the past several years, <br /> Northwestern College was not able to construct on-campus student housing, as was originally <br /> planned. At present, Arden Hall has proven to be a success for Northwestern College. As an <br /> alternative to losing the capacity to house the students living in Arden Hall when the IUP <br /> expires at the end of this school year,Northwestern College is proposing to extend their lease <br /> with TAT Properties and continue the operation of their student housing facility. In turn, <br /> TAT Properties has found it more difficult than originally anticipated to find a viable <br /> redevelopment option for the property, and has submitted an application to the City <br /> requesting the current interim use of the building be converted to a permanent use. <br /> Presently, the Zoning Code does not identify institutional housing as a permitted or <br /> conditional use within the B-2 District. Land uses that are not specifically identified in a <br /> city's zoning code as permitted or conditional uses are considered prohibited. In order to <br /> accommodate the applicant's request to allow the student housing facility to continue <br /> operations at its current site, the request includes a proposal to amend the Zoning Code to <br /> add institutional housing as a use permitted through a PUD process in the B-2 District. This <br /> means that the use would be considered permitted, but would be required to get an approved <br /> Master and Final PUD in order to operate in the B-2 District. <br /> In addition to the request for the Zoning Code Amendment and the Master and Final PUD, <br /> the applicant's are proposing to subdivide the property into two parcels, reserving the eastern <br /> two acres of the site for a future development option that has yet to be determined. The <br /> submitted plans do include a conceptual drawing of a building that might be possible on Lot <br /> 2, but the applicants are not seeking approval for development on Lot 2 at this time. In order <br /> to accommodate the request for the subdivision, and bring the property into compliance with <br /> the City's zoning regulations,the applicants are proposing to remove a portion of the parking <br /> lot and replace it with landscaping and storm water ponding. The storm water ponding <br /> would be shared by the two parcels. The applicant is not proposing any exterior <br /> modifications to the existing building; however, they are proposing improvements to the <br /> landscaping and parking lot, as well as the removal of one curb cut along County Road E and <br /> the installation of a sidewalk. <br /> The applicant has submitted a letter outlining the reasons for the request (Attachment A), as <br /> well as a Preliminary Plat; Site, Drainage, and Utility Plan; and Landscaping Plan <br /> (Attachment E). <br /> 2. Planned Unit Development (PUD) Process <br /> The PUD process is a tool that provides additional flexibility for developments that could not <br /> otherwise be developed in the manner allowed in the underlying zoning regulations. For <br /> example, a PUD may change the setbacks, lot coverage, lot sizes, parking requirements, <br /> City of Arden Hills <br /> Planning Commission Meeting for September 8, 2010 <br /> C:IDOCUME-I IMEAGAN-I.BEETLOCALS-I I Temp1ELF8109-08-10-PC Report-Arden Hall.doc <br /> Page 2 of 14 <br />