My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-11-24 - CC Packet - (Admin.)
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-11-24 - CC Packet - (Admin.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 10:04:08 AM
Creation date
8/30/2011 10:03:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ARDEN HILLS - ENGINEERING SERVICES <br /> Request for Proposals <br /> 4. CURRENMECENT PROJECTS <br /> Provide a listing of four recent projects (completed within the last three years) <br /> ransiing in size from $100,000 to $1,000,000 based on the cost of construction. <br /> This listing should indicate the services provided, for whom the work was <br /> performed, construction costs, engineering costs and any special circumstances <br /> which affected this job. Ideally, the engineering services provided should be from <br /> project inception through construction, including but not limited to feasibility, <br /> design, surveying, bidding, staking, inspection, etc. This list of projects should be <br /> representative of the type of work which could be undertaken in the City of Arden <br /> Hills. <br /> ADDITIONAL INFORMA ION <br /> rovide any additional information you feel is pertinent to our consideration of <br /> your firm in this selection process. <br /> a. Does your firm carry insurance to protect clients from errors and <br /> omissions? In what amount? <br /> .b. Has your firm been the subject of litigation, mediation, or arbitration <br /> during the last five years? If so, give details of the issue and its resolution <br /> IQ. Has your firm ever been re uested by a client to retire from a project? If <br /> 0, present details. <br /> Cf. What experience do you have in assisting communities in marketing <br /> building projects. I <br /> e. What experience do you have in dealing with the "public process "? <br /> f. Describe your approach to various projects <br /> — Holy Flo you deal with design or site pro lems - anticipated or upexpected' <br /> SELECTION CRITERIA <br /> The City will consider each of the submitted areas in its selection process. additional criteria <br /> used in the selection process will include the demonstrated ability to effectively and efficiently <br /> manage the project within the City's stated requirements, approach to scope of services, <br /> demonstrated previous experience, compatibility of approach with the requirements of this <br /> specific project, and cost control methods. <br /> MINIMUM ENGINEERING SERVICES RFOUIRED <br /> The City requires the following areas of engineering expertise for existing and future projects: <br /> 1. Stormwater quantity and quality management. <br /> 2. Sanitary sewer and municipal water management. <br />
The URL can be used to link to this page
Your browser does not support the video tag.