Laserfiche WebLink
Mr. Jim March, Administrator <br /> August 5, 1996 <br /> Page Two <br /> Option 2 includes extending watermain north from Westview Street, west of the <br /> elementary school. The estimated construction cost for this extension to the plat is <br /> $24,200. Easements would need to be obtained from the Westview Street right -of -way <br /> to the plat boundary. <br /> Option 3 includes extending watermain along Peltier Lake Drive and Centerville Road. <br /> The estimated construction cost for this watermain extension is $72,920. Please note that <br /> this cost only includes extension of watermain. Street reconstruction costs were not <br /> included in this estimate. No easements would be necessary for this work, as the <br /> watermain would be constructed within City right -of -way. <br /> SANITARY SEWER ISSUES <br /> A close sewer connection for the development would be to extend the sewer south from <br /> the existing stub at the dead -end of Centerville Road. As -built drawings of this sewer <br /> show the sewer at a minimal depth. To provide sewer service to the development without <br /> a lift station may require considerable fill to be transported to the site. The Developer <br /> of the property would need to provide a grading plan for review to determine the <br /> feasibility of utilizing this sewer co ection. <br /> WETLAND ISSUES <br /> The access road to Main Street is shown to be constructed through what appears to be a <br /> wetland area. The amendments to the Wetland Conservation Act passed earlier this year <br /> allow for certain impacts to wetlands for public road projects. However, the Corps of <br /> Engineers continues to regulate this type of activity and may require mitigation for the <br /> proposed street. <br /> DEVELOPMENT COSTS <br /> Estimated construction costs for the proposed development are outlined below: <br /> Street $181,700 <br /> Sanitary Sewer 42,300 <br /> Watermain 58,400 <br /> Storm Sewer and Pond 15.000 <br /> Estimated Total Construction Cost $297,480 <br /> Overhead (32%) 95.194 <br /> Estimated Total Project Cost $392,674 <br /> 260!083 -0502.aue <br />