Laserfiche WebLink
Mr. Jim March. Administrator <br /> August 5, 1996 <br /> Page Three <br /> These preliminary estimates, as mentioned above, would be further refined and evaluated <br /> during preparation of a feasibility study for the development. The above estimate does <br /> not include utility work required to connect the watermain or sanitary sewer to the <br /> existing systems. <br /> We hope the above information is useful to the City of Centerville for evaluating this <br /> proposed development. Please let me know if we can be of further assistance. <br /> Sincerely, <br /> MSA, CONSULTING ENGINEERS <br /> D 4A ,L 6t . AJkA <br /> David E. Nyberg, P.E. <br /> Project Engineer <br /> DEN:tw <br /> cc: Mr. Rockey Goertz, K -G Development, Inc. <br /> 260,0874)502.3ue <br />