<br />;,a;t~!if;r1~Th~~',:~~~~'~#_-,~i~;:~~~~~'l';;~'~~~}r;~'?;;~~~~.c,,~"~~:t~~~~R~~:,:,;'$'~: 1',.~;;,;::"://,_2/~::_.-_-,_i_-.'::~::~'f:::;-;,--,t: ~;;~:;~~::--:?,!:~:'?j1';':~,-~r-$!o;:~;::"'i[j::t:!.-i:'?~~:-\~{:;:;~~::,.'t~T~i:.~:::~\':i.~~~4.~t,~r~rJ:,;}:.}~'jJ..'itJ.~;~-'@",~~'~fi~.;~~:,&N.~E:r~~~~-f.~~
<br />y
<br />
<br />/
<br />/ .t-'
<br />Co Development Contracts were signed between the City and the Developer for both 'QP'- o. \Y
<br />the initial development and for the nearly completed 2d Addition (Attachment E) ~ 1/ .~#
<br />This development contract calls for, among other things, the final grading and ;' . 9"'""'" ~
<br />~(M- ~; sodding of the addition and the wear course on PortagE} Way by July 1,2003. It also pD\'\- ~',t
<br />'h:s: ~-l &1R requires proper silt fencing during construction and prompt sweeping of sidewalks pl~ ~I ~
<br />~~ . and streets within 24 hours of notice by the city (primarily to prevent sediment fronl" ~ :-1# I ,
<br />1lt.t L~ w)D ~ the development site from entering the storm sewers and their outflow into ponds and ~:~
<br />1 streams of the Rice Creek Watershed District.). It also provides for erosion contro~ ~
<br />and for an active role of the city Engineer in approvals and inspections of the
<br />construction and development of the addition.
<br />
<br />d. Escrow and Cash Security. The city is holding, from the developer, $2,896 in
<br />escrow for remaining engineering, and $58,575 in cash security, pending satisfactory
<br />completion of the 2d Addition.
<br />
<br />e. RCWD Performance Surety. Per email from Rice Creek Watershed, 6-6-03 (part
<br />of Attachment D), the Rice Creek Watershed District has issued a permit for the
<br />Eagle Pass development project (#96-104), and is holding a performance surety on
<br />this project.
<br />
<br />Issues, Concerns, Questions and Requests.
<br />
<br />a. 1849 - 1855 Pioneer Lane. This issue is inadequate drainage along the back side of
<br />these units, which results in standing water between these units and the single family
<br />~ ~ homes opposite this drainage line. This area was part of the first phase of our
<br />. ~ LA;;; development and, according to the city and the builder/developer, the city's 1% grade
<br />l,~ --;} . was met. However, the fact remains that there is still. standing water whenever it
<br />~ 0_1111 rains; trees along the drainage line are dead or dying; and it's a breeding ground for
<br />~/~' I lrOPy-YU misquitos. Request that the city determine whether or not single family
<br />~ ~ fY - --- homeowners htzve altered the landscape in such a way as to negate the proper
<br />i) \J~ I,JJY \ drainage of this area. Further request that the city consider reviewing its' standards
<br />{< '?' . for grade in view of this and other development's experience.
<br />
<br />b. 1854 Pioneer Lane. This is also a drainage issue, and a part of the first phase of our
<br />development. Swift Construction has indicated to us that they will fix this problem
<br />by regrading the line of drainage from the south into the swale and catch basin, lower
<br />the existing catch basin, and sod the area. Request the city's assistance in assuring
<br />that this is accomplished and that the remedied drainage is satisfactory.
<br />
<br />, Co Portage Way (2d Addition to Eagle Pass). This is a grading, drainage issue, and silt
<br />/~r;f~ tf(1\- ~. erosion issue. For whatever reason, with the buildup of the Second Addition to
<br />~...i.kt fP Eagle Pass (portage Way), water from the wetland between Dupre Rd. and Voyager
<br />~ ]~J,V Ct. now flows in excessive' amounts towards Dupre Road, into the storm sewers, and
<br />~ (?'- subsequently into the pond behind 7042 and 7050 Dupre Rd. It may be that this