My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-23 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2003
>
2003-07-23 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:56:20 PM
Creation date
2/10/2006 2:42:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. " <br /> <br />Kim Moore-5ykes <br /> <br />From: <br />Sent: <br />To: <br />Cc: <br />Subject: <br /> <br />James Halstrom Dghalst@co.chisago.mn.us] <br />Tuesday, July 15, 2003 11 :11 AM <br />ksykes@centervillemn.com <br />ppalzer@centervillemn.com <br />RE: Eagle Pass Issues July 14 <br /> <br />Thanks, Kim. I notice last night that someone had put the silt fence back up along Dupre <br />in the area of the Portage Way addition, but not all around Portage Way itself (on both <br />sides), and portage way and Dupre definitely need to be swept. Not to mention the Ojibway <br />portion of the 2d addtion to Eagle Pass. <br /> <br />Jim Halstrom <br />Chisago County Emergency Management <br />Chisago County Veterans Services <br />38794 Sixth Ave. <br />North Branch, MN 55056 <br />Phone: (651) 674-5725 <br />Fax: (651) 674-5712 <br />jghalst@co.chisago.mn.us <br /> <br />>>> "Kim Moore-Sykes" <ksykes@centervillemn.com> 07/15/03 10:57AM >>> <br />Good morning, Jim -- <br />Thank you, I did receive my copy of your packet and the Councilmembers' packets are in <br />their mailboxes. We are working on a response to the issues that you highlighted in your <br />letter. As far as the other 2 issues that you raised in your email of yesterday's date, I <br />will contact the City Engineer about the grading and the contractor regarding the silt <br />fences. If water is flowing into the sedimentation ponds, that's what supposed to happen <br />after rains or spring thaws. These ponds are designed to catch sediment, mud, etc. <br />thereby preventing particulate matter from going into the lakes, creeks and other <br />wetlands. And you're right, that these ponds do require to be dredged from time to time <br />to maintain them so that they continue to cle~ the run off before it get to our lakes and <br />ground water. <br /> <br />I spoke to the developer this morning and he indicated to me that the sodding issues <br />should be resolved within two (2) weeks. Paul said that he will drive over to Eagle Pass <br />and check the silt fences. If the silt fences need repair and/or the streets need to be <br />cleaned, he will contact the developer. Please let me know if the street sweeping is not <br />done by Thursday. Have a great day. Kim <br /> <br />-----Original Message----- <br />From: James Halstrom [mailto:jghalst@co.chisago.mn.us] <br />Sent: Monday, July 14, 2003 2:16 PM <br />To: ksykes@centervillemn.com <br />Cc: indyjp1@aol.com; nfitzg7003@aol.com; ppalzer@centervillemn.com; <br />lbroussardvickers@earthlink.net; jwoodrow@gassen.com; tomlee@now-tec.com; marilyn.myles- <br />newman@spps.org; terry@sweeneyconstruction.biz; donevangel@usfamily.net; dcapra@visi.com; <br />jjuhl@Visi.com <br />Subject: Eagle Pass Issues <br /> <br />By now you should have seen the letter and attachments of our issues which I handcarried <br />to the city Friday afternoon, with individual copies to the mayor and council, city <br />attorney, city engineer, city public works, etc. We look forward to a formal response to <br />our letter, and scheduling of further discussion and action by the council at its' July 23 <br />meeting (per direction of the Mayor at the council meeting on July 16th. While all the <br />issues presented are important to us, two require immediate attention by the city: (1) a <br />city engineer and public works inspection and review of the pre-sod grading and drainage <br />of the new Portage Way addition to insure that there won't be future problems with <br />drainage there (these are provided for in the development contract and can be billed to <br />the developer); and (2) immediate enforcement of the silt fencing and sweeping of affected <br />streets by the developer in accordance with terms of the Development Contract for the 2d <br />Addition (Portage Way) to Eagle Pass. We've communicated this several times before to the <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.