My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-23 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2003
>
2003-07-23 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:56:20 PM
Creation date
2/10/2006 2:42:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />defined as the additional cost for any mains and appurtenances larger than 6" diameter. The <br />costs associated with lateral water main along Centerville Road will be funded through special <br />assessments to benefited properties using an equivalent lot method, and based on similar costs <br />for water main in the adjacent Pheasant Marsh Addition. <br /> <br />3. SERVICES: <br />Sanitary sewer and water service line costs are proposed to be assessed based on the actual cost <br />to the benefiting property. <br /> <br />4. TRUNK WATER MAIN: <br />The proposed 8" diameter water mains on Beaver Pond Way and Dupre Road are considered <br />"trunk" distribution mains. Therefore, the additional cost for the larger pipe (8" vs. 6") should <br />be funded through the City's trunk water main fund. <br /> <br />Item Q!y Unit Unit Price Total Price <br />8" vs. 6" water main 1,630 LF $3.00 $4,890 <br />8" vs. 6" gate valve 3 EA $200.00 $600 <br />8" vs. 6" fittings 750 LB $1.50 $1,125 <br />8" vs. 6" joint restraint 37 EA $10.00 $370 <br />8" vs. 6" jacking 50 LF $10.00 $500 <br /> Subtotal $7,485 <br /> 5% Contingency $375 <br /> Total Construction $7,860 <br /> 30% Indirect Costs $2.360 <br /> Total Trunk Water Main $10,220 <br /> <br />ASSESSMENT CALCULATION <br />The developer of Hunters Crossing Second Addition, Richard Carlson, has agreed to pay for all <br />the utility and street improvements within the plat. In addition to this, Mr. Carlson will pay part <br />of the sanitary sewer and water main costs for the work along Centerville Road. Existing <br />property owners along the road that will benefit from the new utilities will be assessed also. <br /> <br />Hunters Crossing 2"" Addition <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.