My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-11 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2013
>
2013-12-11 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2013 4:07:30 PM
Creation date
12/6/2013 4:06:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 5, 2013 <br /> Dallas Larson <br /> Page 2 of 3 <br /> Reference: Annual Thin Bituminous Overlay Program <br /> 2014 Thin Bituminous Overlay Project <br /> 2014 Thin Bituminous Overlay Project <br /> Planning _Phase <br /> • We understand that there will not be assessments associated with this project. Therefore, a <br /> Feasibility Report is not necessarily required. If the council wishes to assess the project, our scope <br /> maybe expanded under separate proposal. <br /> • Evaluation of Streets scheduled for overlay. This involves a tour, with the Public Works Director, of <br /> the streets scheduled for overlay as well as others which may not have been on the schedule, but <br /> which the Public Works Director feels should be examined for possible inclusion in the project. <br /> • Attendance at a City Council Workshop to discuss the project scope and budget. <br /> • Assistance with examination of sewer, water and storm sewer infrastructure. Recommend repairs <br /> or replacements to be constructed ahead of the overlay project. <br /> Plans, Specs <br /> • Preparation of Plans and Specifications (small modifications of programmatic plans /specs) <br /> Bidding Phase <br /> • Assistance with Bidding: publish Ad for Bid (ad costs paid by city), answer bidder questions, <br /> produce and distribute Addenda, attend Bid Opening, produce /review Bid Tab <br /> • Preparation of Contracts <br /> Construction Phase <br /> • Preparation for and attendance at a Preconstruction Conference <br /> • Periodic support of City's Project Inspector (Greg Burmeister) during construction ( <5 hrs /wk) <br /> • Production of minor Change Orders <br /> • Issuance of Pay Requests; final payment after review of IC -134s, Lien Waivers <br /> These services would be provided for the scope of the proposed 2014 Thin Bituminous Overlay Project <br /> which includes (see attached): <br /> • 73r Street (Old Mill Rd. to Brian Drive) • Meadow Lane <br /> • Quebec Street • Deer Pass Drive <br /> • Old Mill Road (73` St. to South end of • Pioneer Lane <br /> Hanzal Development) • Steven Lane <br /> • Lakeland Circle (Main St. to Centerville . Revoir Street <br /> Road (east leg)) • Brian Court <br /> • Dupre Road (Voyager Ct. to Portage <br /> Way) <br /> Design with community in mind <br /> 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.