My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-22 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-07-22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 3:19:40 PM
Creation date
7/17/2015 3:18:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21.2.2 Work with appropriate road authorities to reconstruct and provide <br /> additional capacity for CSAH 21. <br /> 21.2.3 Work with appropriate road authorities to construct Northerly <br /> Bypass with new interchanges at I-35W and I-35E(80th Street East) <br /> to improve traffic operations and access to and within the AUAR <br /> area.As recommended by FHWA and Mn/DOT,a phasing plan <br /> should be established to construct each piece of the Northerly <br /> Connector as it becomes necessary to maintain the serviceability of <br /> the transportation system.t <br /> Phase Improvement <br /> I. CSAH 14,1-35W to I-35E(funded and programmed for <br /> construction) <br /> 2. CSAH 14,I-35E Interchange <br /> 3. CR 140(80P Street)/1-35E Interchange <br /> 4. CSAH 14 across Peltier Lake(Northerly Bypass/Connector) <br /> 5. CSAH 14/1-35W Interchange <br /> As part of these improvements,the following steps should be taken <br /> as the opportunity is presented: <br /> ■ Inclusion of the northerly bypass and proposed interchanges in <br /> future transportation and comprehensive plans <br /> ■ Preservation of right of way through official mapping or other <br /> process <br /> ■ Right of way dedication through the platting process <br /> 21.3 Require a traffic impact analysis for all development projects within the AUAR This mitigation measure is ongoing <br /> area. The traffic impact analysis will assist the City and other road authorities in <br /> determining the appropriate mitigation measures that are required to mitigate <br /> 1 CSAH 14 Alternative Analysis Report—July,2004,SRF Consulting Group, <br /> 13 Mitigation Plan Update -2015 June 3,2015 <br /> 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.