My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res. #16-029 - 2017 Street Improvement Project, Mill & Overlay
Centerville
>
City Council
>
Resolutions
>
2000-2023
>
2016
>
Res. #16-029 - 2017 Street Improvement Project, Mill & Overlay
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2017 7:40:12 AM
Creation date
10/27/2016 1:44:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 10, 2016 <br />Mike Ericson <br />Page 2 of 3 <br />Annual Thin Bituminous Overlay Program <br />2017 Thin Bituminous Overlay Project <br />Opening, and produce and review a Bid Tabulation. Once bids are received and presented to <br />the City Council for award, contracts will be prepared and distributed for execution. <br />Construction Phase <br />This proposal assumes that the city's Lead Project inspector, Greg Burmeister will continue in his <br />role as the primary, on-site representative during construction. We would support him with the <br />following tasks: <br />6, Preparation for and attendance at a Preconstruction Conference <br />is Periodic support of City's Inspector (Greg Burmeister) during construction (<5 hrs/wk) <br />• Production of minor Change Orders <br />• Issuance of Pay Requests; final payment after review of IC -134s, Lien Waivers <br />These services would be provided for the scope of the proposed 2017 Thin Bituminous Overlay <br />Project which includes (see attached): <br />0, Mound Court <br />• Mound Trail <br />• Gateway Circle <br />• Beaver Pond Way (Hunter's 1 st Add.) <br />• Various Trails <br />The preliminary construction cost estimate for these improvements is $225,000. <br />Fees <br />Based on the scope of work and scope of project outlined above, the following is a summary of <br />our not -to -exceed fees. Our work would be billed on a monthly basis, in accordance with our <br />Master Services Agreement and per our current rate schedule. The values in the table below <br />would not be exceeded without a change in scope and written permission from city officials. <br />Phase <br />FETE Fee <br />Feasibility Study <br />$„500 <br />Plans/Specs <br />$1,500 <br />Bidding <br />$1,500 <br />Construction <br />2p00 <br />Total <br />$9,000 <br />ter; 1 fi vvffl[ fi,i"(': ;r in C Ir'Ctr <br />
The URL can be used to link to this page
Your browser does not support the video tag.