Laserfiche WebLink
and not connect through to any other property,the City may is to consider making that <br /> a <br /> ®v connection to the city sidewalks/trails,to be maintained by the homeowner's <br /> association.Also,trail lighting should be considered. <br /> Ile traillboardwalk is proposed to be located over the sanitary sewer. If that is going to <br /> be the case, and if the Council determines thiss o of trail,the <br /> owners should be responsible to repair or replace the trail at their own expense,should <br /> the city need to excavate the sewer. <br /> The narrow lot spacing is not ideal on either side of Lot 13 where water and sanitary <br /> sewer will be constructed. Easements would need to be granted on the small lots as well <br /> as the open space between. Ideally,the easement would not encroach on the small <br /> building lots,but rather stay within the common areas. Perhaps Lot 13 should be <br /> elumnated to avoid crowding where the utilities are constructed. If one or more to in <br /> the <br /> l® were eliminated it would also permit adding some additional off-street <br /> parking where it is needed most. The number of proposed off-shreet parking spaces seems <br /> insufficient,given the large number,and the spacing,of driveways, especially in the cul- <br /> de-sac. <br /> City Code requires that the Homeowner Association documents be submitted for review <br /> by the City.Those have not been received.HOA requirements are in City Code Sec. <br /> 156.263. The HOA should receive ownership of any common spaces,including the <br /> traillboardwalk development sign,off-street parking spaces, etc. <br /> A draft findings and recommendation for approval of the subdivision is attached. <br /> Approval should he granted only in conjunction with the PUD. If you deteranne that the <br /> request should not be acceptable, I recommend that you table the matter to allow findings <br /> to be prepared for denial. <br /> PLANNED UN1T DEVELOPMENT.The PUD section of the Code is the means by <br /> which a development with difficult site conditions can be considered. In return for lesser <br /> setbacks,wetlands am preserved and other concessions may be granted by the developer. <br /> All of the setbacks are not meeting the normal requirements for the underlying zoning <br /> distria Lot size is about 4,000 square fed,well to the 15,000 square feet called for <br /> in the underlying district,but adequate for a townhorne lot. The density is well below the <br /> maximum permitted in the underlying district,the wetlands make it very difficult to <br /> achieve a reasonable density that can cover the high costs of development <br /> City Code that a PUD be processed and approved in the same manner as a <br /> requires <br /> conditional or interim use permit. Also,a PUD development agreement would be <br /> required to assure that all of the cities concerns are taken care of and that the developer <br /> provides financial guarantees to assure performance. <br /> A draft findings and recommendation for approval of the PUD is attached.If you <br /> determine that the request should not be acceptable <br /> e,I recommend that you table th <br /> matter to allow findings to be prepared for denial. <br /> Dallas Larson,Interim Administrator <br /> 36 <br />