Laserfiche WebLink
(3 Stantec <br /> February 2,2017 <br /> Mike Ericson <br /> Page 3 of 5 <br /> Reference: Ruffridge Johnson CUP <br /> screening is required to mitigate the proposed outdoor storage (if the area exceeds the <br /> ordinance standard). <br /> Grading Plan, <br /> I) The Of fence has a gap on the western side of the site. It should surround the site asshown <br /> on the eastern side. <br /> 2) A valley gutter/concrete apron should be shown at the entrances tat site. Add a detail <br /> to Sheet C3. If care is taken upon removal of the existing curb of the entrance locations and <br /> the pavement edge is maintained,you may our concrete against the edge of pavement. <br /> If the edge of pavement is damaged or sloughs off,we Will require the front edge of the <br /> apron to be poured against a for and a 2' v4de bituminous patch to be saw-cut, removed <br /> and repaved. <br /> 3) The rock construction entrance is shown at the location of an existing catch basin. It should <br /> be moved to avoid covering tet tch basin. <br /> 4) In the far northeast and northwest corners of the paved area the curb appears to empty <br /> onto the "millings" area with a riprop swale adjacent. We suggest a more deliberate route <br /> for the water to enter the nprap swale,such as a curb-cut,just for tothe end of the curb. <br /> The current design may result in some wash-outs at the end of the curb.This issue must be <br /> addressed in the final design. <br /> 5) It's not clear what type of curb is being used where. There are details for B612, both gutter-in <br /> and gutter-out. The final design must clarify this issue on the final grading plan. <br /> X10 Plan <br /> I) A pump is called out for the sump basin. A detail should be added to Sheet C3 unless this is <br /> covered in the building mechanical plans.The applicant should also clarify if there will be a <br /> backup generator, in the case of a power outage? <br /> 2) It is also unclear if the entire roof drains into the 10" pipe on the south side of the building? If <br /> there is to be an outlet for the north If of the roof it should be shown on the plan. <br /> Detail Plan: <br /> 1) Details for the trench drain, catch basin, manhole, and sanitary cleanout must be added. <br /> SUMMARY. RECOMMENDATIONS AND SUGGESTED FINDINGS <br /> The approval of a conditional use permit will authorize the development of a new business on a key <br /> property that isowned by the City.The development of this property will put it back on the tax rolls <br /> and mark the end of a long process. <br /> Design with community In mind <br /> me r,:\u5ers\meri=o.,)\Clppdata\bcal\microsoff\windows\temporary Internet riles\ronient.ouilook\rkksDcq4\ruffridge Johnson plan osv1ew_M17-02-W,docx <br />