My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-11-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2018
>
2018-11-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2018 8:10:18 AM
Creation date
11/28/2018 8:09:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ECONOMIC DEVELOPMENT <br /> Economic Development Authority <br /> The EDA's next meeting is scheduled for December 5, 2018 at 6:30 p.m. Mike Brass <br /> (our realtor)is scheduled to be there to discuss the city's various properties. <br /> Quad Area Chamber of Commerce <br /> I have accepted a position on the Chamber's board of directors. I am eager to represent <br /> the city in this group's economic development efforts. <br /> COMMUNITY DEVELOPMENT <br /> Comp Plan <br /> The Planning and Zoning Commission reviewed proposed changes to the draft <br /> Comprehensive Plan related to housing density ranges. These changes allow for a more <br /> realistic projection of the number of new homes that may be built on developable or <br /> redevelopable land in the city. This information will be shared with the city council at <br /> their next meeting,prior to final adoption of the comprehensive plan. <br /> Peltier I,Mate <br /> Ruffridge Johnson <br /> A ribbon cutting ceremony and open house has been scheduled for December 12, 2018 at <br /> 4:30 PM. All City Council are invited to attend. <br /> Waterworks Site/DeFoe Property <br /> Grading work is nearly complete. At the time of this report, utility work and road base <br /> construction were within days of completion. It appears that construction will reach a <br /> point which allows the issuance of building permits for model homes and/or homes <br /> which have already been sold. <br /> Old Mill Estates <br /> We continue to work with the developer on various elements of the development process. <br /> The two homes on the site have been raised and the site is now ready for grading. We <br /> anticipate construction to begin in the spring. <br /> Block 7 Property <br /> The city continues to see interest in the site. Our realtor, Mike Brass has been in regular <br /> contact with four separate parties. We anticipate at least three of those parties will follow <br /> through with presenting a concept plan to the Planning Commission at the January <br /> meeting. We will work with the EDA to plan a joint meeting with P&Z or a separate <br /> 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.