Laserfiche WebLink
Centerville,MN-Evaluation 2 <br /> KLM Work Plan <br /> ROV Inspection <br /> KLM plans to utilize a two-man crew and a Remote Operated Vehicle (ROV) to perform the <br /> inspection. This inspection method can be performed in one day. <br /> KLM will provide NACE Coatings Inspectors, whom are properly trained and qualified to <br /> perform this type of inspection. To perform an ROV inspection, the Owner would be required to <br /> have the water at or near the high-water level (HWL) at the start of the inspection. KLM <br /> inspectors will insert a disinfected ROV into the tank interior, for the interior inspection of the <br /> roof, roof structure, and all appurtenances such as vents, manways, and ladders. Photographs will <br /> be taken with an underwater camera, which will show the coating deficiencies. The camera will <br /> be disinfected in accordance with AWWA. The inlet pipe or wet riser is excluded from the <br /> inspection, unless otherwise written into this agreement. <br /> Dry Tank Cleanout& Inspection <br /> The dry tank inspection is the method recommended by AWWA M 42 D101-53 (R1986)Part A. <br /> This method is limited to areas accessible from a ladder or areas that can be reached from the <br /> floor. <br /> KLM will inspect the floor, reservoir walls, and any interior structure accessible by ladders. All <br /> accessible exterior surfaces, including the roof, will also be inspected. KLM will measure and <br /> photograph all areas that need to be included in the inspection report. KLM will provide a ladder. <br /> The Owner would be responsible for draining the tank prior to inspection. <br /> When the tank is empty, KLM will perform a clean-out of the tank interior. KLM will disinfect <br /> the tank in accordance with Method 1, 2, or 3 of AWWA C652-11. KLM will require the <br /> assistance of the Owner to back-flush and disinfect the reservoir of the tank. KLM will supply <br /> the chlorine and do the clean-out of the bottom. <br /> Owner's Responsibilities <br /> ROV Inspection <br /> The Owner's personnel shall be responsible for: <br /> ■ Providing copies of background information on tower, including maintenance records, <br /> construction drawings,previous inspection reports, and previous painting or <br /> reconditioning specifications. It is especially helpful if this information is collected prior <br /> to KLM's personnel beginning its inspection. <br /> ■ Provide keys for locks and access to the water tower. <br /> Dry Tank Cleanout Inspection <br /> KLM will require the assistance of the Owner to back-flush the tank. The Owner would need to <br /> provide a supply of water to perform the cleanout. A typical clean-out consists of washing down <br /> most of the heavy sediment while the water is draining. KLM will disinfect the tank when <br /> completed. <br /> The Owner's personnel shall be responsible for: <br /> ■ Verifying the tower is empty prior to arrival of inspectors. <br /> ■ Disposing of sediment removed from the tower. <br /> ■ Providing copies of background information on the tower, including maintenance <br /> records, construction drawings,previous inspection reports, and previous painting or <br /> reconditioning specifications. It is especially helpful if this information is collected prior <br /> to KLM's personnel beginning its inspection. <br /> ■ Take water samples after the cleanout °If3J& tower has been completed. <br />