My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-09-09 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2020
>
2020-09-09 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2020 6:03:45 AM
Creation date
9/8/2020 6:02:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.0 PROBLEMS AND OPPORTUNITIES <br />7.1 Problems <br />1. The DWSMA for Centerville’swells is moderately vulnerable to contamination. This <br />conclusion was established by water chemistry, age dating techniques indicating “young” <br />water, and the geologic sensitivity. <br />2. Portions of the DWSMA include areas of commercial and industrial activity, some of which <br />represent potentialpoint sources of contaminants. <br />3. The total number and location of wells in the DWSMA is not known with a high degree of <br />certainty.. <br />5. There is no accurate inventory or database for Class V wells, so it is unknown how many <br />Class Vwells may exist within the DWSMA. <br />6. A portion of the DWSMA isoutside of the city limits of Centerville, making management of <br />thisareas nearly impossibleto accomplish without cooperation from other local units of <br />government. <br />7. Existing leak sites within the DWSMA create uncertainty for the potential of contamination to <br />later affect the City’s wells. <br />7.2 Opportunities <br />1. Since the DWSMA extends beyond Centerville’sborders, an opportunity exists to work with <br />other communities in planning land uses in order to protect the area’s groundwater resources. <br />2. Anoka County and Washington County offerassistance in managing wellhead protection <br />areas. This assistance includes grant funding and financial aid to seal unused wells located in <br />wellhead protectionareas. <br />3. Commercialand industrial zoned areaswithin the DWSMAare still in the process of being <br />developed. Careful planning before development occurs can help reduce the risk of impacts to <br />groundwater. <br />4.Despite the vulnerable setting, the water quality of groundwater historically pumped is very <br />good. Maintaining existing groundwater quality is easierthan repairingalready-contaminated <br />groundwater resources. <br />5. Limiting the installation of new wells, along with sealing of unused wells, in areas covered by <br />the DWSMA delineation would reduce potential pathways for contamination to reach the <br />aquifers. <br />16 <br />193803358 <br />Stantec Consulting Services, Inc. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.