Laserfiche WebLink
<br />10kW Model <br />This model uses an average designed kW per rack of 10kW but still maintains all of the attributes <br />in the Assumptions section on the previous page. <br />Figure EA-4: 10kW Model <br /> <br />Observations <br />o The chart lays out the CapEx and OpEx costs for constructing the facility at 3.4 MW (1 <br />data hall), 13 MW (4 data halls), and 33 MW (10 data halls). <br />o The design includes space for server build rooms and shared collaboration and <br />conference rooms for each data hall. <br />o The average build cost per rack is well under the market at $1,822 per rack, which allows <br />the buyer to achieve an ROI of 48% on the initial investment, including all annual OpEx <br />costs. <br />o The projected construction costs of this model are $27.6K per kW; note the construction <br />cost nearly doubles when increasing from 5kW to 10 kW per rack. <br /> <br /> <br />2020 MTC DCLM DC Model (1) Page 13 of 20 <br /> 2020 Excipio Consulting, LLC. All Rights Reserved. This document is proprietary and confidential and may not be duplicated, <br />redistributed, or displayed to any other party without the expressed written permission of Excipio Consulting LLC. <br /> <br />