My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-19 EDA Packet
Centerville
>
EDA
>
Agenda Packets
>
2020
>
2020-11-19 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2020 10:58:34 AM
Creation date
11/14/2020 10:58:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10kW Model <br />This model uses an average designed kW per rack of 10kW but still maintains all of the attributes <br />in the Assumptions section on the previous page. <br />Figure EA-4: 10kW Model <br /> <br />Observations <br />o The chart lays out the CapEx and OpEx costs for constructing the facility at 3.4 MW (1 <br />data hall), 13 MW (4 data halls), and 33 MW (10 data halls). <br />o The design includes space for server build rooms and shared collaboration and <br />conference rooms for each data hall. <br />o The average build cost per rack is well under the market at $1,822 per rack, which allows <br />the buyer to achieve an ROI of 48% on the initial investment, including all annual OpEx <br />costs. <br />o The projected construction costs of this model are $27.6K per kW; note the construction <br />cost nearly doubles when increasing from 5kW to 10 kW per rack. <br /> <br /> <br />2020 MTC DCLM DC Model (1) Page 13 of 20 <br /> 2020 Excipio Consulting, LLC. All Rights Reserved. This document is proprietary and confidential and may not be duplicated, <br />redistributed, or displayed to any other party without the expressed written permission of Excipio Consulting LLC. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.