Laserfiche WebLink
We hope to have a conceptual rendering to review in about a month. <br /> <br />STORMWATER/WETLAND <br /> <br />LaMotte Park Stormwater Reuse System Expansion <br />Staff is actively negotiating an agreement with <br />agreement can be reached, the contractor is ready to begin work. <br /> <br />SEWER AND WATER <br /> <br />Wellhead Protection Plan <br />The draft Part II plan is being sent to surrounding jurisdictions for comment after receiving <br />word from the MN Department of Health that their normal review process has been upset <br />by their work on COVID-19. They have said that they, will, instead comment after <br />adjacent jurisdictions. <br /> <br />Watermain Interconnect <br />The new meter has been installed and we are waiting on the SCADA connection. <br /> <br />2020 Downtown Street and Utility Improvements <br />CenterPoint Energy is nearing completion of their work to install a new main and <br />services, allowing them to abandon the old main so we are free to construct our new street <br />and storm sewer. Other utilities such as cable, communication and power have also been <br />moving their utilities as require <br />contractor is now looking to be back on site in mid to late June. Barring further <br />interruptions to the schedule, this should leave them plenty of time to finish the project <br />this summer. <br /> <br />PARKS AND RECREATION <br /> <br />Fete des Lacs <br />The Fete des Lacs Committee made the difficult decision at their meeting on May 6, to cancel <br />Fete des Lacs, 2020. The strong conviction of the committee, however, was that there would <br />s festival be one to remember. <br /> <br />