My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-11-02 P & Z Packet - Revised
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2021
>
2021-11-02 P & Z Packet - Revised
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 1:39:00 PM
Creation date
11/2/2021 1:29:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 2, 2021 <br />Centerville Planning & Zoning Commission <br />Page 10 of 10 <br />RE: Shingle Creek Capital, LLC - Rezoning and Conditional Use Permit <br />8) All lighting on site, whether existing or new, shall be downcast cutoff type fixtures that allow <br />no more than 0.5 footcandle onto the public right-of-way of Main Street, with a detailed <br />lighting plan and fixture specifications submitted for review by the Planning & Zoning <br />Commission and City Council. <br />9) Paving of all surfaces on site shall be submitted with detailed plans for review by the <br />Planning & Zoning Commission and City Council and reviewed and approved by the city <br />engineer. <br />10) Stormwater handling on site and design of the pretreatment area shall be submitted with <br />detailed plans for review by the Planning & Zoning Commission and City Council and <br />reviewed and approved by the city engineer. <br />11) All engineering and infrastructure issues shall be reviewed and approved by the city <br />engineer. <br />12) All signage on site, whether existing or new, shall be submitted with plans for review by the <br />Planning & Zoning Commission and City Council and reviewed and approved by the city <br />engineer. <br />13) The design of the exterior building remodeling, including materials and colors, area shall be <br />submitted with detailed plans for review by the Planning & Zoning Commission and City <br />Council. <br />14) Trash handling will be completely within the enclosed building or an approved trash <br />enclosure submitted with detailed plans for review by the Planning & Zoning Commission <br />and City Council. <br />15) Include standard conditions for CUP enforcement and compliance. <br />Since a conditional use is a permitted use to which reasonable conditions may be attached, <br />denial of the CUP is not recommended. Rather, the Planning & Zoning Commission should craft <br />conditions that address reasonable issues that can be accomplished by changes to the site or <br />building plans. <br />60-DAY RULE <br />The applications for rezoning and conditional use permit were received on October 13, 2021. Final <br />deadline for action by the City Council per Minnesota Statutes 15.99 on both requests is <br />December 13, 2021. <br />
The URL can be used to link to this page
Your browser does not support the video tag.