Laserfiche WebLink
Stantec Consulting Services Inc. <br />733 Marquette Avenue Suite 1000, Minneapolis MN 55402-2309 <br />November 3, 2021 <br />File: 193885141 <br />Attention: Mr. Mark Statz, City Administrator/Engineer <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038 <br />Dear Mark, <br />Reference: Proposal for Engineering Services - Old Mill Court Boardwalk <br />This letter outlines the Scope of Services and estimated costs to provide structural engineering services for <br />a short boardwalk through a wetland area adjacent to Old Mill Court. Our understanding is that the <br />proposed boardwalk will be 6’ to 8’ wide, approximately 85’ long, and will be constructed on helical piers to <br />minimize wetland impacts. <br />The proposed scope of work will generally be limited to the structural engineering components of design <br />and construction observation for the boardwalk. It is our understanding that the City will provide the <br />boardwalk layout and site plan, solicit quotes, coordinate geotechnical services, and provide contract <br />administration for this work. The City will also procure all permits. <br />Scope of Services <br />The scope of services for this project will consist of the tasks below. <br />Task 1 – One virtual meeting/phone call with the City at 60% plan status to review the plans, schedule and <br />other logistics. <br />Task 2 – Design / Construction Documents. Stantec will provide boardwalk structural details, railing and <br />abutment details, and technical specifications, certified by licensed professionals, for the proposed pile- <br />supported trail. Final project specifications will be written in CSI format and prepared to allow accurate <br />bidding and expeditious construction. We will also provide a quote form for the City to utilize to solicit <br />contractor quotes. <br />Task 3 – Geotechnical Review. Our team will provide the City with the required scope of the geotechnical <br />services so the City can solicit quotes from geotechnical firms. Stantec will review the geotechnical report <br />and incorporate its results and recommendations into our structural design. Geotechnical investigation will <br />consist of a maximum of three soil borings at periodic intervals along the proposed boardwalk alignment. <br />The prepared geotechnical report will include information related to the subsurface conditions, potential <br />obstructions, and recommendations for the helical pile installation including pile depths and capacities. <br />Geotechnical consultant costs are not included in this proposal and will be paid for by the City. <br /> <br />