My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-19 P & R WS Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2022
>
2022-04-19 P & R WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 5:02:14 PM
Creation date
4/15/2022 5:02:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Centerville 2040 Comprehensive Plan <br /> <br /> <br />its relationship with the local network of trails and sidewalks. A Tier 2 RBTN alignment aligns <br />with <br />CSAH 14 at the northern boundary of the City and extends along CSAH 14 to the eastern <br />boundary of the City. Also, a Tier 2 RBTN runs along CSAH 21 from the southern boundary of <br />the City to CSAH 14. The City does not contain a regional employment cluster or activity center <br />node. <br />The planned redevelopment of the downtown area will have a distinct pedestrian friendly feel, <br />accomplished through streetscaping elements such as boulevard trees, decorative concrete <br />sidewalks and intersection treatments, on-street parking, decorative pedestrian lighting and <br />other landscape amenities. <br />A network of trails will allow bicycle access to the downtown while providing viable bypass <br />routes for those on more regional trips through the area. No planned regional or local trails <br />require connections over major physical barriers such as freeways, railroad corridors, rivers or <br />streams <br />Bicycles and pedestrians can access the regional transit network by accessing the park and ride <br />st <br />facility at Main Street (CSAH 14) and 21 Street which serves as a stop for Route 275. Trails that <br />provide pedestrian and bicycle access to this facility include the regional trail along CSAH 14 as <br />well as planned city trails through downtown and sidewalks along CSAH 21. <br />S PECIAL S ITUATIONS <br />At this time the City is not involved in any right-of-way preservation projects or corridor studies. <br />T RANSIT P LAN <br />Centerville is located in transit market area IV. Centerville currently has limited transit service, <br />with the Route 275 bus running on weekdays during the AM and PM rush hours. This service <br />runs on roughly 30-minute intervals with service beginning at 6:00 am and ending at 7:40 am <br />for AM rush hour and drop-off between 4:18 and 5:50 for PM rush hour. Route 275 operates <br />between the Forest Lake Transit Center in Forest Lake and downtown St. Paul, with a stop at <br />the I-35E & County Road 14 Park and Ride in Lino Lakes. <br />st <br />Centerville has one park and ride location at Main Street (CSAH 14) and 21 Avenue N. The <br />location of this facility is shown on the Transportation Plan Map (Map 6-1). Centerville also has <br />public dial-a-ride service provided by Anoka County Traveler Transit Link and operates <br />Monday-Friday from 6:00 a.m. to 7:00 p.m. and volunteer program called Anoka County <br /> <br /> Page 82 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.