My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-03 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2025
>
2022
>
2022-05-03 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2022 7:43:17 AM
Creation date
5/2/2022 7:27:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response: <br />Plans have been updated to no longer show pavement being excavated in 21 st Ave. The <br />watermain extension is now proposed to connect at the location of the hydrant shown <br />above. <br />6. Water and Sewer Access Charges will apply based on a Met Council "SAC Determination" letter. <br />Response: <br />Comment noted. <br />Parks and Trails <br />Several potential trail segments are shown in red (right). The blue line on the figure below is a <br />future trail to be constructed on the east side of 21St Ave. by Lino Lakes. The stars represent <br />retail locations, south of Main Street that might be more easily accessible with the red and blue <br />segments constructed, especially for neighborhoods in the south part of the city. The safety of <br />crossings at 20th Avenue and Fairview and/or 20th Avenue and Commerce Drive would need to <br />be considered along with the safety issues associated with these trail segments crossing <br />industrial driveways and parking lot entrances. <br />Ryan Companies US, Inc. <br />533 South Third Street, Suite 100 <br />Minneapolis, Minnesota 55415 <br />ph:612-492-4000 <br />ryancompanies.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.