My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-07 P & Z Agenda
Centerville
>
Planning & Zoning
>
Agenda Packets
>
2025
>
2025-01-07 P & Z Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 9:31:49 AM
Creation date
1/7/2025 9:31:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
water supply capacity and well trigger analysis completed in April 2024, the city may need to <br />add an additional well to accommodate this development or the development may be deemed <br />premature. The City is currently working through this process with MNDNR. <br /> <br />The site provides opportunity to implement a stormwater reuse system for irrigation purposes. <br />The system should be evaluated and implemented to the extent feasible to offset the use of <br />municipal water for irrigation. <br /> <br />Staff Comments: <br />1.The watersupplyissue needs to be addressed prior to PUD Preliminary Plan/Preliminary <br />Plat submittal. <br /> <br />Yield Plan <br /> <br />As required per City Code Section 1001.026(4), the applicant submitted the attached yield plan. <br />The yield plan shows the maximum number of dwelling units that would be permitted given the <br />minimum lot size and lot widths for conventional subdivisions and other requirements of the <br />Lino Lakes Zoning and Subdivision Chapters. <br />The submitted yield plan indicates single family lots and townhomes totaling of 504 housing <br />units; however, the plan does not accurately reflect allowed shoreland lot sizes and shall be <br />revised. <br /> <br />The proposed concept plan is 262 housing units. <br /> <br />Phasing Plan <br /> <br />The phasing plan indicates four (4) phases of development. <br /> <br />Staff Comment: <br />1.The timing of park dedication and park and trail construction shall be further evaluated. <br />Traffic Study <br />Although a traffic study is not required at the time of concept plan review, one was submitted. <br />The study states the intersections are projected to operate acceptably. A northbound left turn <br />lane is required. <br />Staff Comments: <br />1.The traffic study will be fully evaluated upon submission of the preliminary plat. <br />11 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.