My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-08-08 CC Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2001
>
2001-08-08 CC Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2007 11:55:53 AM
Creation date
1/19/2007 11:55:31 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Item <br /> <br />Unit <br /> <br />Qty <br /> <br />Unit Price <br /> <br />Part 6 - Sanitary Sewer - Phase 2 <br /> <br />Connect to existing manhole <br />8" PVC sanitary sewer, SDR 35, 8'-10' deep <br />8" x 4" PVC wye <br />Improved pipe foundation, per 6" increment <br />Closed circuit TV inspection <br />4' diameter sanitary MH, 8' deep <br />4' diameter sanitary manhole overdepth <br /> <br />EA 2 $500.00 <br />LF 560 $17.00 <br />EA 14 $70.00 <br />LF 560 $2.00 <br />LF 560 $1.00 <br />EA 2 $1,600.00 <br />LF 5 $100.00 <br />Subtotal <br />5% Contingency <br />Total Construction Costs <br />30% Indirect Costs <br />Total Part 6 <br /> <br />Part 7 - Water Main - Phase 2 <br />Connect to existing 8" water main <br />8" PVC water main <br />6" PVC water main <br />8" gate valve and box, in place <br />6" gate valve and box, in place <br />Hydrant <br />Ductile iron fittings <br />Improved pipe foundation, per 6" increment <br /> <br />EA 3 $500.00 <br />LF 520 $20.00 <br />LF 350 $16.00 <br />EA 2 $1,000.00 <br />EA 3 $700.00 <br />EA 3 $1,500.00 <br />LB 1,500 $2.50 <br />LF 870 $2.00 <br />Subtotal <br />5% Contingency <br />Total Construction Costs <br />30% Indirect Costs <br />Total Part 7 <br /> <br />Part 8 - Services - Phase 2 <br /> <br />1" corporation stop <br />1" curb stop and box <br />1" Type "K" copper water service <br />4" PVC, Sch. 40 service pipe <br /> <br />EA 29 $100.00 <br />EA 29 $130.00 <br />LF 1,300 $10.00 <br />LF 1,200 $12.00 <br />Subtotal <br />5% Contingency <br />Total Construction Costs <br />30% Indirect Costs' <br />Total Part 8 <br /> <br />Total Price <br /> <br />$1,000.00 <br />$9,520.00 <br />$980.00 <br />$1,120.00 <br />$560.00 <br />$3,200.00 <br />$500.00 <br />$16,880.00 <br />$844.00 <br />$17,724.00 <br />$5,317.00 <br />$23,041.00 <br /> <br />$1,500.00 <br />$10,400.00 <br />$5,600.00 <br />$2,000.00 <br />$2,100.00 <br />$4,500.00 <br />$3,750.00 <br />$1,740.00 <br />$31,590.00 <br />$1,580.00 <br />$33,170.00 <br />$9,951.00 <br />$43,121.00 <br /> <br />$2,900.00 <br />$3,770.00 <br />$13,000.00 <br />$14,400.00 <br />$34,070.00 <br />$1,703.00 <br />$35,773.00 <br />$10,732.00 <br />$46,505.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.