My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-08-09 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2000
>
2000-08-09 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2007 12:27:05 PM
Creation date
2/8/2007 11:47:43 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />and equipment can be replaced simultaneously. The expectation is that the truck will have to <br />be replaced first. In this instance, equipment from the old truck will continue to be utilized in <br />the new truck, until We can afford the digitE,1 replacements. As the new equipment is put in <br />place, the old truck equipment will be used to outfit a control room for the second studio. <br /> <br />With this goal in mind, we plan to replace flO equipment in 2001. However, if an essential <br />piece of equipment ceases to function, we will have to tap into the equipment fund to replace <br />it. <br /> <br />FUTURE EQUIPMENT PURCHASI::S <br /> <br />. 2002 <br />Phase two of the master control upg'ade v.. ill be the primary concern in 2002. We will want to <br />purchase some DVCPro playback dE:cks a: Id cards, SVHS playback decks and cards, and <br />DVCPro play/record decks for a dub rack <br /> <br />Hopefully we can also purchase some DVC;Pro mastering equipment for the studio, staff edit <br />suite, and truck. <br /> <br />We will continue to make contributiOllS to tile equipment fund. <br /> <br />. 2003 <br />The final phase of the equipment upgrade n master control will be undertaken. This will <br />include additional tape decks, audio and vi, Jeo distribution amplifiers, test equipment, monitors <br />and modulation equipment. <br /> <br />Additional DVCPro mastering equipment p Irchases may be made <br /> <br />We will continue to make contributions to t Ie equipment fund <br /> <br />· 2004 and beyond <br />By 2005, we could possibly have the monE; / to fully outfit a new production truck with digital <br />equipment. <br /> <br />Our goal is to outfit the truck so that its output is true digital. This would require us to buy a <br />digital switcher, audio and video routers and distribution amplification system, and cameras. <br /> <br />We could buy the equipment in pieces, but that would be more expensive for us in the long <br />run. If you are using analog equipment and digital equipment simultaneously you need <br />additional equipment (cards) to translate the signals between the equipment. This can actually <br />be quite expensive, and unnecessary if all of our equipment was digital to begin with. <br /> <br />If we can wait until 2004-2005 to buy both the new truck and digital equipment, we will. If we <br />have to purchase the truck earlier, we will continue to use the equipment from the old truck <br />until we can afford to replace all of it with digital equipment. At that time, the old equipment <br />will be used to outfit a control room for the second studio. <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.