Laserfiche WebLink
<br />12. Comprehensive Plan (000616-07157-0). The Background Report was presented to a joint <br />meeting of the Planning Commission and City Council on June 5, 2007. Bonestroo is in <br />process of preparing new goals and policies for the August 'jh Planning Commission meeting. <br />Bonestroo will be using the edited version already completed by the staff and Planning <br />Commission and updating them from these edits. . <br /> <br />, 13.2009 Street and Utility Improvements (000616-07158-0). We have begun our investigation <br />of the condition of streets in the proposed project and will be evaluating the appropriate level of <br />improvements. <br /> <br />14. CSAH 14 Construction Services (000616-07159-0). Once the project is awarded, we will be <br />' acting as the City's representative in the field during construction. <br /> <br />1$. MiseeDanfi'Ous _ <br />· We submitted a scope of services and engineering proposal for the production of a <br />Downtown Redevelopment Comprehensive Infrastructure Plan. This would layout, <br />conceptuaUy, the sewer, water, storm water, and street systems to allow continuity and <br />reliability of these systems as they are designed and constructed in phases. Included <br />with this proposal is a separate estimate to complete an EA W if it is necessary. This <br />proposal also now includes topographic survey work. <br />· We are working with the Public Works department to shape a pond and ditch <br />maintenance policy/plan and annual budget. <br /> <br />- End U/memo- <br /> <br />----- - ~- --- --- - -- -- - ---- --- --- -- - - --- - <br />