Laserfiche WebLink
<br />City Council Meeting Minutes <br />Page Four <br />August 12, 1987 <br /> <br />with Valley Paving to overlay these streets. <br /> <br />Motion by Wi1harber, second by Laska to overlay Progress Road, <br />LaMotte Drive, and Mound Trial at this time, motion carried <br />unanimously. <br /> <br />Public Works Director also advised Council of water problem on <br />the intersection of Peltier Lake Drive and Clearwater Drive. <br />City Engineer will look into this tomorrow. <br /> <br />Public Works Director left the meeting at 9:20 p.m. <br /> <br />OLD BUSINESS <br />John Stewart, City Engineer gave an update on the road <br />reconstruction. Samples that were taken from fabric that was <br />laying exposed to Braun Engineering, Inc. did pass the tests for <br />strength and quality. A second sample has been taken to Twin <br />City Testing and the results should be available the end of the <br />week. The second layer of blacktop will not be done until the <br />replacement of blackdirt and sod/grass seed in the boulevard <br />areas. <br /> <br />City Engineer presented a change order to put in 2.5 inches of <br />blacktop this year and the final 1.5 inches next year on Mill <br />Road, for Valley Paving and the cost of implementing this order <br />as requested by the City Council. Cost $1,158.09. <br /> <br />Members of the audience expressed concern about the road <br />reconstruction: <br />Myra Spijer, 7200 Mill Road <br />Maureen Asleson, 7232 Mill Road <br />Carol Pelton, 7178 Mill Road <br />Bill Svetin, 1687 Mill Road <br />Jim Smith, 1629 Peltier Lake Drive <br />George Haberman, 7288 Mill Road <br />John Probst, 7167 Mill Road <br />Joe Pelton, 7178 Mill Road <br /> <br />Clerk with check with City Attorney to determine how to recommend <br />permanent weight restrictions. <br /> <br />John Johnson, of Merila and Associates noted that it is difficult <br />to prove damage was done by a particular developer unless the act <br />is actually viewed. <br /> <br />Motion by Laska, second by Neumann to complete both layers of <br />blacktop on Mill Road in 1987, motion carried unanimously. <br /> <br />Motion by Wilharber, second by Neumann to assess corner lots <br />abutting two sides of the road reconstruction project at 100% of <br />