My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003 CC Minutes
Centerville
>
City Council
>
Minutes
>
2000-2009
>
2003
>
2003 CC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2006 8:29:24 AM
Creation date
10/14/2005 1:11:07 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Centerville <br />June 25, 2003 <br />Council Meeting Minutes <br /> <br />Motion bv Council Member Broussard Vickers. seconded bv Council Member Lee <br />to approve Resolution #03-040 as presented. All in favor. Motion carried <br />unanimouslv. <br /> <br />Patricia Turgeon, 7269 Centerville Road, indicated that her neighbors brought to her <br />attention a proposed sidewalk along with the water assessment. <br /> <br />Mr. Peterson indicated the sidewalk was added during the design of the overall project to <br />determine what the costs for extending the sidewalk would be. He then indicated that the <br />estimated cost to each resident for the sidewalk extension would be $2,800.00. <br /> <br />Council Member Broussard Vickers indicated that the sidewalk has not been approved at <br />this point as Council wanted information on the costs associated with it. Mr. Peterson <br />indicated the City had not done this before as usually sidewalks are added with <br />developments. <br /> <br />Council Member Capra asked why the bid was for concrete rather than bituminous. Mr. <br />Peterson indicated that the contractor bid the concrete a lot less than the bituminous. He <br />then indicated that a few trees and landscaping would need to be dealt with along with <br />excavating 8 or 9 inches of material. <br /> <br />Council Member Broussard Vickers questioned whether there was a need for the <br />sidewalk. <br /> <br />Council Member Capra suggested using park dedication fees to extend the sidewalk as it <br />is an extension of existing trailways. <br /> <br />Council Member Broussard Vickers indicated she did not feel it was necessary to spend <br />that amount of money for the small gain. <br /> <br />Council Member Capra indicated she would like to use money out of park dedication fees <br />to make the connection. Mr. Peterson indicated there would still be a gap from <br />Centerville Road to Peltier Circle. <br /> <br />Council Member Capra asked when that road was scheduled for reconstruction. Mr. <br />Peterson indicated it was set for five years. <br /> <br />Mr. Peterson indicated there is a lot of water in the comer requiring drain tiling. He then <br />commented that a resident in that location is having issues with his concrete driveway <br />heaving. <br /> <br />Mayor Sweeney indicated it did not make sense to install the sidewalk until there are <br />storm sewers in the area. <br /> <br />There was consent of Council to wait on the sidewalk until reconstruction of that road. <br /> <br />Page 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.