My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-10-26 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2005
>
2005-10-26 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:38:18 PM
Creation date
10/28/2005 11:37:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RIGHT OF WAY: <br /> <br />The parties agree that the County will acquire all necessary right-of-way and easements for the Project. <br />Acquisition of any additional right-of-way and/or easements needed for the improvements to the City street <br />intersections beyond what is defined in the Exhibit "A" Layout will be the responsibility of the City. The <br />parties agree that parcels required for the project that are owned by the City will be conveyed to the County <br />at no cost to the County. The parties agree that any properties acquired by the County within Centerville that <br />are in excess of the right-of-way needed for the pr~jeg~and are-"uneco*o:rnic remnants" shall be conveyed to <br />the city. The city shall have the first right of refu~U!QPurchase marketable excess property at appraised <br />market values that the county has purchased. It is agreed by the parties that the City shall . Qrm all special <br />assessment searches required for the Project at no cost to the County. It is agreed by th~ arties that all <br />necessary right of way and easements will be in legal possession of the County prio ../if ceptance of bids for <br />the project. <br /> <br /> <br />.. <br /> <br />BITUMINOUS TRAIL AND CONCRETE SIDEWALK: <br /> <br />The parties agree that the construction of the bituminous trail and con te sidewalk are eligip for federal <br />funds and that all matching funds will be contributed by the City. e parti derstand that the cost for the <br />trail and walk includes: bituminous and concrete surfacing, ag - rains if required, soil <br />correction, excavation, borrow material (granular and topsoilYo' lishment. The parties agree that <br />the County will pay for the design of the trail and walk, wetland miti quired by impacts caused by the <br />trail and walk, the additional right of way and easements required to con e trail and walk at the proper <br />location, and any removal items, wi~ the except~~ll()f,~oils, required to c ~~ ru~t.the trail and walk. Anoka <br />County will apply for funds through the Metro "Parlcs{1ti"ail Pro am for ossibler~imbursement to the City <br />after construction. <br /> <br />A traffic signal is anticipated at the <br />the signal will be installed with <br />constructed at CSAH 14/Ce <br />stop condition will be m . <br />population, the costs of the si . <br /> <br /> <br />TRAFFIC SIGNALS: <br /> <br />~Oth Avenue N) intersection. The parties agree that <br />s are met. The parties agree that conduit will be <br />intersec . for a future signal; howe~~!, the existing four-way <br />ed. un...........................'......al............,....l..:..s..... installed. Because Cen....t.e...rv.' ille is a City under 5,000 <br />als on this projec:tip-~;~9Iely the County's expense. <br /> <br />The intersection at <br />in reconstruct <br />achieved i <br /> <br />,rtfited to a right-in, right-out condition until the interchange at 1-35E <br />ttache he layout presents how access to the south of Main Street will be <br />mple on of the 1-35E interchange. <br /> <br />The partie <br />perform soil <br />Lake and Cent <br />correction and. <br /> <br />d agree that CSAH 14 will be closed with traffic detoured for a period of time to <br />n, construct the new bridge over Rice Creek, and possibly a land bridge between Peltier <br />e Lake. The closure will be limited to the period of time required to complete the soil <br />onstruct two paved lanes in the area requiring soil correction and construct the bridge(s). <br /> <br />DRIVEWAYS: <br /> <br />The parties agree that all driveways affected by the Project will be reconstructed in kind with the cost of any <br />upgrades requested by the City including concrete aprons to be the responsibility of the City. Tum-arounds <br />on driveways will be paid for by the County. <br /> <br />LANDSCAPING/STREETSCAPING: <br /> <br />Page 2 of 5 <br /> <br />H:\Highway 14 Project'Centerville02-614-24MOU7-29-05.doc <br /> <br />3Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.