My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992 Rec./Disb./Res. & Minutes
Centerville
>
City Council
>
Minutes
>
1990-1999
>
1992
>
1992 Rec./Disb./Res. & Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2006 8:27:18 AM
Creation date
11/18/2005 9:15:21 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY COUNCIL MEETING MINUTES <br />OCTOBER 14, 1992 <br />PAGE FIVE <br /> <br />within the County right-of-way <br />contractor tried to move the water <br />road to fit around the newly plant <br />no additional cost to the City. <br /> <br />at 1873 Main Street, the <br />lines closer to the County <br />trees as it appears to be at <br /> <br />Center Oaks Ditch Maintenance Proiect <br />John Stewart, City Engineer, advised that a punch list has been <br />given to the contractor regarding low spots in the ditch on the <br />north side of Center Oaks Development. He also noted that <br />restoration work is not yet complete. He noted that it would be <br />nice for the ditch to be better than it is, but it would never be <br />completely dry and more puddles do occur over time with <br />sedimentation. <br /> <br />Center Street Crack Fillin~ <br />The City Council considered the bid from American Paving and <br />Construction Company for crack filling longitudinal cracks on <br />Center Street between Pheasant Lane and Centerville Road. It is <br />the recommendation of the Public Works Director to accept the <br />bid. <br /> <br />It was noted that in reviewing the bid the City Engineer made the <br />following comments regarding the proposal: <br />a.) Include "rout out all cracks to 3/4" X 3/4..... <br />b.) How many linear feet of crack? <br />c.) Looks satisfactory. <br />d.) Amend to read: "Fill all cracks with hot pour KOCH <br />3405 hot pour rubber." <br />e.) Should be a three year warranty as we have done in the <br />past with previous projects. <br /> <br />The City Council expressed concern regarding spot projects, the <br />possibility that the road is currently under warranty from other <br />crack filling projects and that no quantity estimate has been yet <br />submitted with the bid. <br /> <br />Mr. Stewart advised that he has not physically reviewed the <br />street and is not aware of why the Public Works Director would <br />separate this section from all other streets within the City. <br /> <br />Motion by Burgstahler, second by <br />Engineering Liaison the authority <br />filling after review of the road way <br />dollar amount not to exceed <br />unanimously. <br /> <br />Buckbee to authorize the <br />to award the bid for crack <br />by the City Engineer for a <br />$1,500.00, motion carried <br /> <br />L'Allier Estates Pedestrian Access Across Clearwater Creek to the <br />Centerville Elementary School <br />
The URL can be used to link to this page
Your browser does not support the video tag.