Laserfiche WebLink
<br />WHAT HAS HAPPENED TO DATE? <br /> <br />I <br /> <br />./' The process includes a technical analysis side and a public involvement side to be done <br />concurrently to meet the project objectives. <br /> <br />./' Three public informational meetings have been held to date.. (/-.;,... Lt-d- \ftLV ) <br /> <br />./' Four alignment alternatives were chosen to be evaluated as a result of the first public <br />meeting, 140111 Street Alignment, 142nd Street Alignment, 1451h Street Alignment (existing) <br />and 14th Street Alignment. <br /> <br />./' The 140lh Street alignment was eliminated from further study because of environmental <br />""7 impacts, right-of-way and construction costs, and travel patterns. <br /> <br />./' The 142nd Street, 145th Street, and 147th Street alignments are moving forward for further <br />analysis in an Environmental Assessment (EA). <br /> <br />J5E <br /> <br />z ~ <br />w <br />> <br />< <br />~ <br />w <br />" z <br />u <br />3 ~ <br /> < <br /> ~ <br /> " <br /> ~ <br />11 8 RENCi"li.:'..J <br /> < <br /> <br /> <br />'e, <br />'", <br /> <br /> <br />LINO <br />LAKES <br /> <br />. ! <br />CENTERVILLE! <br />...~ER ! <br /> <br />! <br /> <br />r~= '''''" " <br /> <br />I <br />~ <br /> <br />" <br /> <br /> <br />, <br />; <br />u <br /> <br />HUGO <br /> <br />21 <br /> <br />j <br />, <br />< <br />! <br />., <br />J <br /> <br />'JOn, <br /> <br />s,. " <br /> <br />GENERAL ALIGNMENT ALTERNATIVES <br />